Field glossary · measurement
Polarization index (PI)
Polarization index (PI) describes resistance growth during a sustained insulation test: PI = R10 / R1, with readings taken at ten minutes and one minute. A rise from 300 to 750 megohms yields PI 2.5; 30 to 75 megohms yields the same ratio. Report both resistance values with PI, because the ratio alone hides that tenfold difference and becomes less useful when the initial resistance is already extremely high.
Ratio of the 10-minute to the 1-minute reading; above about 2 is commonly good
Calculate PI from one uninterrupted resistance trace
AEMC's Models 5000N, 5100 and 5110 manual expresses the timed comparison as PI = R10 / R1. The 750-megohm later reading divided by the 300-megohm earlier reading gives 2.5; entering the earlier reading first instead gives 0.4. A report template should label elapsed time beside each resistance field so the calculation is auditable.
Retain both timed readings beside the ratio. A second winding reading 30 and 75 megohms also has PI 2.5, despite having one-tenth the resistance at each time. Equal PI values therefore do not establish equal insulation condition. The insulation-resistance guide covers the absolute reading and test preparation.
An alarm setting is not an equipment acceptance rule
Megger's Baker AWA-IV quick-start guide specifies PI minimum alarm settings of 1.5 for Class A motor insulation and 2.0 for Classes B, F and H. Those are named instrument settings for the described motor application. They are not a blanket acceptance criterion for every transformer, cable and busway that receives a megohmmeter test.
The same Megger guide directs users to treat PI as a diagnostic and trending result alongside other tests, rather than using it alone to accept a motor. Put the equipment type and governing acceptance document on the test record so a software alarm does not silently become the purchase specification.
When a very high reading weakens the ratio
Megger warns that PI may lose meaning when the one-minute insulation resistance exceeds 5,000 megohms. A small absolute leakage current and weak polarization response can produce little ratio growth even when the measured resistance is high. A flat ratio in that situation needs the actual resistance curve and equipment context.
An overrange reading supplies a bound, not an exact numerator. With 500 megohms at one minute and greater than 5,000 megohms at ten minutes, report PI greater than 10 rather than PI equal to 10. When both readings exceed the instrument's range, their ratio remains undetermined. Retain the applied test voltage, elapsed times, resistance trace and range indications in the exported record.
Frequently asked questions
Can two separately restarted tests supply the two PI readings?
The ratio describes resistance during one sustained test. Restarting changes the insulation charging history, so separate one-minute and ten-minute runs do not reproduce that measurement.
Does PI 2.0 mean the insulation passed?
It meets the cited Baker alarm setting for Class B, F and H motor insulation, but the alarm is one diagnostic condition. The absolute resistance, curve shape and equipment acceptance specification still determine what that result establishes.
Sources checked
Also defined as
- Datacenter: Ratio of the ten-minute to the one-minute IR reading; a rising ratio indicates dry, sound insulation
- Ratio of the 10-minute to the 1-minute insulation resistance reading