Field glossary · equipment
EPSS
An EPSS, or emergency power supply system, combines the generating source with the equipment needed for its specified load-restoration duty. Under NFPA 110, a Type 10, Class 2, Level 1 designation means a 10-second interruption limit, two hours at rated load without refueling or recharging, and requirements addressing failure that could cause death or serious injury. Replacing the source, batteries, or transfer controls must preserve all three attributes.
Emergency power supply system: the source, prime mover, transfer equipment, and controls taken together under NFPA 110
Decode a Type 10, Class 2, Level 1 designation
NFPA lists 2025 as the current NFPA 110 edition. Cummins' explanation of its classification rules makes the three identifiers separate acceptance questions. A 200 kW Class 2 plant needs two hours at that rated load, equivalent to 400 kWh of electrical output; this calculation is not a fuel-tank volume.
A fast start cannot compensate for inadequate stored energy. Likewise, a long full-load run cannot compensate for a late transfer. Match each result to its own part of the specified designation in the acceptance package.
| Specified identifier | Acceptance question | Misreading to avoid |
|---|---|---|
| Type 10 | Was acceptable power restored at the ATS load terminals within 10 seconds? | Timing only the engine start |
| Class 2 | Can rated load be carried for at least 2 hours without refueling or recharging? | Proving runtime only at a reduced load |
| Level 1 | Does the design address the consequences of failure involving loss of life or serious injury? | Treating Level 1 as a count of generators |
Find the missing second in the transfer sequence
Cummins' NFPA 110 classification guidance places the interruption endpoint at the transfer-switch load terminals. A sequence taking 0.7 second for detection, 6.5 seconds for starting and source qualification, 0.8 second for first-set arbitration and breaker closure, and 1.0 second for transfer totals 9.0 seconds.
Against the specified Type 10 limit, that event has 1.0 second of margin. Adding a 2.0-second transfer delay produces an 11.0-second interruption, although the engine starts just as quickly. Capture controller event times and the load-terminal restoration time together to identify which stage consumed the margin.
The standby installation guide identifies the connected equipment. Timing the complete sequence reveals a delay between otherwise functional components.
Starting batteries need reserve cranking capacity
Cummins identifies NFPA 110-2025 section 5.6.4.4 as requiring enough battery capacity to maintain the engine manufacturer's cranking speed through two complete cranking-limiter periods. One successful start does not demonstrate that reserve.
Section 5.6.4.5 in the same Cummins presentation adds nickel-zinc, lithium-ion, and other capable stored-energy technologies to nickel-cadmium and lead-acid starting batteries. Select the proposed battery against the engine's cranking demand and the charger's compatibility, including any battery-management controls.
A slow starter points to starting energy and connections. Normal cranking with late load pickup points farther downstream in the control and transfer sequence. Replacing a healthy battery will not remove an added transfer delay.
Battery inspections and heater checks serve different duties
Cummins' NFPA 110-2025 summary specifies weekly inspections for Level 1 starting/control batteries and monthly inspections for Level 2 under section 8.3.6. The inspection interval does not replace the battery tests and maintenance required for the installed battery type.
Cummins also identifies section 5.3.1 as requiring temperature maintenance based on the EPS manufacturer's cold-start and load-acceptance needs. Record the specified jacket-water and battery conditions with the heater settings. A warm-weather start offers no evidence that a failed heater will maintain those conditions in winter.
Give the maintenance technician the battery model, charger settings, required starting conditions, and timing baseline. These values make a later substitution review specific to this plant.
Distinctions
- EPS
- A generator replacement concerns the EPS source; an ATS delay change concerns the EPSS delivery sequence. Both can affect the same load-pickup result even though they modify different equipment.
Frequently asked questions
Does Type 10 mean the engine has ten seconds to start?
The interruption allowance includes detection, starting, source qualification, and transfer. In the 9.0-second sequence above, the 6.5-second starting stage is only one part of the result.
Does changing battery chemistry change the EPSS classification?
The specified Type, Class, and Level remain the targets. Verify the replacement against starting capacity, charging compatibility, and the complete load-pickup sequence.
Sources checked
- NFPA: NFPA 110 current 2025 edition and system scope
- Cummins: NFPA 110 for Emergency Power Systems, August 2025, classification, battery capacity and chemistry, inspection intervals, and temperature maintenance
- Cummins Power Topic 7016, part 3, ATS settings: total emergency pickup time includes start delay, starting, and transfer delay
Also defined as
- Datacenter: Emergency power supply system, the whole plant through the ATS load terminals
- Emergency power supply system, the generator and controls backing the emergency loads