Field glossary · process
Load shed
Load shed removes selected electrical loads when available source capacity or an operating limit cannot support them. A complete scheme specifies what initiates shedding, which load leaves next, and what permits restoration. The restoration decision needs its own capacity check and delay. Otherwise the same load that caused an overload can reconnect immediately and repeat the disturbance.
Dropping the lowest-priority load when the set runs short, so the emergency load is the last affected
Compare connected load with capacity actually online
Rehlko's TP-7165 manual, dated February 2026, defines online capacity as the sum of the generators currently connected to the paralleling system. Installed capacity and online capacity are different during a unit failure or a staged start.
Two 500 kW sets carrying 850 kW lose half their online capacity when one set disconnects. The remaining 500 kW set faces a 350 kW steady-state excess before load changes. Shedding a 430 kW lower-priority block leaves 420 kW, or 84 percent of the remaining rating. Transient load acceptance remains a separate generator capability; the steady-state subtraction establishes the required scope of the shed.
Underfrequency and kW overload are different triggers
TP-7165 provides distinct underfrequency-shed and overload-shed functions. Its underfrequency setting is a percentage of nominal frequency, so a configured 90 percent threshold corresponds to 54 Hz on a 60 Hz system.
Cummins' transfer-switch specification presentation describes frequency- and time-dependent shedding with the lowest priority removed first. A commissioning record must identify both the initiating condition and the actual load removed. The paralleling switchgear guide covers the plant sequence; event records should distinguish an intentional capacity shed from a protective trip.
Set a separate condition for adding load back
Rehlko's kW Capacity Add Threshold evaluates current load plus the expected next-priority load before reconnecting it. With 500 kW online and a configured 90 percent add threshold, the allowed total is 450 kW. A 40 kW block added to 420 kW would total 460 kW, so that configuration holds it off.
The manual also distinguishes time-based load addition, which does not check generator capacity or expected block kW. Cummins describes an adjustable 0 to 180 second interval for sequential addition in its example transfer-switch controls. Record the installed controller's method and timing with the standby-system acceptance. A restoration delay alone cannot prove adequate capacity.
Distinctions
- Load sharing
- Load sharing divides the connected demand among online generators. Shedding reduces that connected demand.
- Load shed into soil
- Foundation guides use this phrase for force transferred along a pile or shaft. That is structural load transfer, not electrical load control.
Frequently asked questions
Why does a shed load keep cycling on and off?
Its restoration condition can reconnect it before sufficient capacity returns, or its expected kW can be understated. Compare actual block demand with the add threshold and recovery logic.
Is priority 1 always an emergency circuit?
Priority numbers belong to the configured controller and sequence. The record must map each number to the actual load and its required service category.
Sources checked
Also defined as
- Datacenter: Dropping low-priority load when capacity is lost so the critical load stays up