Field glossary · measurement
THD
Total harmonic distortion (THD) compares combined harmonic RMS content with the meter's selected reference. A waveform with 100 A fundamental current and 50 A harmonic RMS content reads 50% THD-F but 44.7% THD-R because the second method divides by total RMS current. Hioki documents both methods. Record the voltage or current channel, reference method and harmonic range with the result so a changed meter setting does not look like a changed load.
Total harmonic distortion, the harmonic content on voltage or current as a percentage
Reconstruct THD from the harmonic amplitudes
ABB's review of IEEE 519-2022 describes THD using the RMS harmonic content relative to the fundamental, excluding interharmonics. For a current spectrum, combine the harmonic RMS values by squaring each, adding the squares and taking the square root. Do not add their percentages arithmetically.
With 100 A fundamental current, 30 A of third harmonic and 40 A of fifth harmonic, and no other components, the harmonic RMS total is sqrt(30² + 40²) = 50 A. Fundamental-referenced current THD is therefore 50%. Adding 30% and 40% would report 70% and misstate the waveform. Retain the spectrum with the harmonics survey so the total remains auditable.
Why THD-F and THD-R disagree
Hioki's PW4001 documentation distinguishes THD-F, referenced to the fundamental, from THD-R, referenced to the total waveform including the fundamental. It states that THD-R reads lower for a strongly distorted waveform. The instrument's selected method applies to both voltage and current measurements.
For the same 100 A fundamental and 50 A harmonic total, total RMS current is sqrt(100² + 50²) = 111.8 A. THD-R is 100 x 50 / 111.8 = 44.7%, while THD-F remains 50%. Neither result shows a change in the load. A dashboard importing one method and a handheld displaying the other will disagree even with perfect sensors.
Make the reference method part of the EPMS point description, alongside the phase and voltage-or-current identifier. That prevents a meter replacement or configuration change from appearing as a sudden improvement in power quality.
Include the required harmonic orders
ABB's technical note 158 reports that IEEE 519-2022 evaluation requires measurement through at least the 50th harmonic order. On a 60 Hz system, that order is 3,000 Hz. A result calculated through a lower order omits part of the specified spectrum, even if the screen still labels it THD.
Hioki also provides separate harmonic-grouping settings. Match those settings when comparing instruments: a calculation that groups nearby spectral components is different from one that counts only exact harmonic frequencies.
Separate a utility assessment from UPS acceptance
IEEE lists 519-2022 as active and describes its limits as steady-state limits at the user's point of common coupling. Moving an analyzer from that utility interface to a UPS output changes the assessment boundary. Retain the test-point identifier, manufacturer limit and connected load with the UPS commissioning results so that report cannot be mistaken for a utility-interface assessment.
Distinctions
- Total demand distortion
- ABB's review of IEEE 519-2022 describes the demand-current reference using monthly maximum 15-minute or 30-minute demands averaged over the preceding twelve months, with separate provisions for shorter histories and new installations. With 50 A of harmonic RMS content and a 300 A demand reference, TDD is 16.7%, compared with 50% THD-F for the 100 A fundamental above.
- K-factor
- K-factor gives higher harmonic orders more weight when describing transformer heating duty. Two spectra with equal THD need not impose equal heating duty.
Frequently asked questions
Can current THD exceed 100%?
Yes, when referenced to the fundamental. A 40 A fundamental with 60 A of harmonic RMS content produces 150% THD-F. The harmonic content exceeds the reference; the result is not a percentage of total RMS current.
Does 5% THD mean the same thing on voltage and current channels?
The formula is the same, but the quantities differ. With a 480 V fundamental, 5% voltage THD-F means 24 V of harmonic RMS content. With a 100 A fundamental, 5% current THD-F means 5 A. State the channel before comparing results or applying a specified limit.
Sources checked
Also defined as
- Electrical: Total harmonic distortion, the harmonic content as a percent of the fundamental
- Total harmonic distortion, the output waveform's distortion as a percentage