ANVILFIELD Try FieldOS

Field glossary · equipment

TDD

On a roof or reflected ceiling plan, TDD means tubular daylighting device: an optical path from a roof collector to an indoor diffuser. On an electrical power-quality report, TDD means total demand distortion, a current-harmonic percentage referenced to maximum demand. Read the drawing discipline and units before interpreting the abbreviation; the two meanings describe unrelated systems.

Tubular daylighting device, or solar tube, a roof dome feeding a reflective tube to a ceiling diffuser

Used across 2 Anvilfield field guides, most in Roofing.
Updated

Choose tube diameter and route as one daylighting decision

Solatube identifies its residential 160 DS system as a 10-inch tube and its 290 DS as a 14-inch tube. A 14-inch circular section has 1.96 times the area of a 10-inch section, but that geometry is not a promise of 1.96 times the delivered light. Dome optics, tube reflections, bends, diffuser selection, and available sky all affect the output.

Solatube recommends tube runs no longer than 20 feet for the 160 DS and 30 feet for the 290 DS for best light output. Its FAQ also recommends suspension wires for runs exceeding 15 feet or running horizontally. Measure the full optical route and locate supports on that route; ceiling-to-roof vertical distance alone misses the length consumed by offsets.

Distinguish a tube-joint defect from roof-flashing leakage

Solatube's Brighten Up instructions, part 951780 version 3.2, show at least 1 1/2 inches of overlap at tube seams, with the specified screws and foil tape completing the connections. Check the optical joints separately from the roof collector flashing. Separation, loose tape, or a displaced support can interrupt the light path while the roof connection remains dry.

A daylighting complaint after attic work can come from a disconnected tube or a disturbed diffuser without any defect at the roof. Photograph the collector, tube route, joints, and ceiling termination as one identified assembly. That makes a roof repair, an optical repair, and a ceiling finish repair distinguishable in the work order.

Calculate electrical TDD with the demand denominator

Schneider Electric's TDD guidance defines harmonic current as a root-sum-square quantity and IL as the maximum-demand fundamental current at the point of common coupling. Thus TDD = 100 x sqrt(I2^2 + I3^2 + ...) / IL, where each harmonic current is an rms value. Current THD divides the same harmonic quantity by the measured rms fundamental current for that reporting interval.

For an existing installation, Schneider describes IL as the average of the monthly maximum-demand currents over the preceding 12 months, using demand intervals such as 15 or 30 minutes. Preserve that reference and its location in the harmonics report; a momentary current reading is a different denominator.

With 3 A at one harmonic and 4 A at another, combined harmonic current is sqrt(3^2 + 4^2) = 5 A. A 100 A demand reference produces 5% TDD. At a measured fundamental of 50 A rms, current THD is 10%. Adding 3 A and 4 A directly would incorrectly report 7% TDD.

The work order should spell out the abbreviation: daylighting device for a dome-and-diffuser assembly, demand distortion for the electrical percentage. That expanded name prevents a mixed-trade team from assigning an optical complaint to the power-quality technician.

Distinctions

Skylight shaft
A conventional skylight often uses a framed, finished light well. A TDD uses reflective tubing to transport daylight to its diffuser.
THD
With the harmonic amperes and demand reference held fixed, reducing the measured fundamental current raises current THD while leaving TDD unchanged. State whether the meter reports distortion relative to the fundamental or to total rms.

Frequently asked questions

Is the daylight tube also an exhaust duct?

The daylight tube transports light. A separate ventilation accessory or ventilation system supplies the airflow function.

Can a TDD light a room below another floor?

Solatube describes protected multi-story routes through a chase. The available route, tube length, bends, and obstructions determine the layout.

Sources checked

Also defined as

  • Electrical: Total demand distortion, harmonic current as a percent of maximum demand current

Where this shows up

Next step: Track roof retrofit bids

Back to the full field glossary