Cricket / saddle

A cricket or saddle creates a local water-diversion route around a curb or between drains. Its material taper is different from its drainage-valley slope: Elevate's 2024 chart pairs 1/2-inch-per-foot cricket material with a 1/4-inch-per-foot base roof, yet gives only a 1/16-inch-per-foot minimum valley slope at the suggested widths. Survey the valley elevations rather than crediting the board's labeled taper as the finished drainage gradient.

A raised, sloped diverter built behind or around an obstruction to split water past it instead of ponding

Used across 4 Anvilfield field guides, most in Roofing.
Updated

Cricket face slope is not cricket valley slope

Elevate's 2024 Tapered Insulation Design Solutions guide distinguishes cricket material slope, resulting surface slope, and cricket valley slope. A board's taper is one input to the geometry; the assembled valley is the line where the water actually travels.

Elevate's 2024 chart for a 1/4-inch-per-foot roof using 1/2-inch-per-foot cricket material gives a minimum valley slope of 1/16 inch per foot at its suggested minimum widths. The doubled material taper leaves a much shallower valley than the 1/4-inch-per-foot roof pitch.

Measure the fall along the water route

A valley that drops 2 inches over a 16-foot horizontal route has a slope of 1/8 inch per foot. Measuring a steeper cricket face beside it does not change that result. Take elevations at the valley endpoints and any intermediate low point, using a common datum.

Garland's tapered-insulation design guidance treats cricket width-to-length proportion and roof slope as linked design variables. Widening the cricket changes the valley geometry; a long narrow wedge can leave a weak drainage route despite substantial thickness at its ridge. Compare the layout with actual drain and curb positions before releasing the board schedule.

On the survey sheet, retain the horizontal valley distance separately from its elevation difference. A 1/16-inch-per-foot valley loses only 1 inch over 16 feet. A local rise of that size can consume the entire scheduled fall even though both adjacent cricket faces look steep.

Small surface deviations matter on shallow valleys

Elevate's warning about a 1/20-inch-per-foot minimum valley applies to its chart for a 1/8-inch-per-foot base roof with at least 1/4-inch-per-foot cricket material. Elevate advises avoiding crickets in those conditions because minor roof anomalies can create ponding. Keep the base slope attached to the warning when reviewing a proposed layout.

A raised board joint, local deck depression, or misplaced drain sump can consume a shallow valley's fall. Put the surveyed endpoints on the cricket layout and identify which drain receives each valley. Compare those elevations after the substrate is ready, before cutting the tapered package to a base plane that exists only on the drawing.

Distinctions

Backslope or backwash
A backwash directs water away from a wall or high obstruction toward the roof drainage system. Its geometry can combine with a cricket, but its slope is still distinct from the resulting valley slope.
Drain sump
A sump locally lowers the surface around a drain. It helps water enter that drain but does not correct a valley that slopes away from it farther upstream.

Frequently asked questions

Is a cricket twice the roof slope always sufficient?

No. The material slope and the cricket dimensions jointly determine the valley fall. Elevate's chart demonstrates a 1/16-inch-per-foot minimum valley with 1/2-inch-per-foot cricket material over a 1/4-inch-per-foot roof.

What belongs on a cricket survey?

Record the roof base slope, cricket dimensions, valley endpoint elevations, intermediate low spots, and drain elevation. These elevations reveal the water route through the completed assembly.

Sources checked

Also defined as

  • A built-up diverter on the upslope side of a wide curb or skylight that splits water around it
  • A raised, sloped diverter that pushes water around a curb or between drains toward a drain