Field glossary · component
Base flashing
Base flashing is the waterproof transition between the roof field and a rising surface. Sika's Roofing Applicator Handbook uses an 8-inch upstand above roof level unless a lower detail receives written acceptance. That water-clearance dimension is separate from tall-wall restraint: Sika Bulletin 24-01 uses thresholds above 45 or 60 inches for specified adhered systems, and a 24-inch maximum for its specified loose-laid wall arrangement.
The roof material turned up a wall or curb that waterproofs the joint, commonly at least 8 in above a low-slope roof
Set the water clearance before laying out restraint
Sika's Roofing Applicator Handbook sets an 8-inch flashing height above roof level; exceptions require written acceptance from both the owner's representative and Sika's Roofing Technical Department. Its top-edge fastening requirement is a separate item. Mark the required termination elevation on the wall before laying out any intermediate attachment rows.
For a curb surrounded by tapered insulation, take clearance readings at every face and corner. The roof elevation can differ around the same curb even though its top remains level. A survey with the curb top, local roof surface, and each restraint row on one datum reveals the short face that a single measurement misses.
When tall wall flashing needs intermediate restraint
Sika Technical Bulletin 24-01 requires intermediate securement above 45 inches for Sarnafil or Sikaplan flashing adhered with Sarnacol 2170, 2170 VC, Stabond, or SarnaRoof DS 100. The bulletin expressly exempts a wall exactly 45 inches high. Record the adhesive designation with the height; "adhered PVC" is not a complete attachment description.
For flashing adhered with Sarnacol 2175, Sika's January 2024 bulletin moves the intermediate-securement threshold to heights above 60 inches. A change in adhesive can therefore change the applicable detail even when the membrane brand and wall dimensions remain the same. Use the selected detail's treatment of fasteners, cover strips, and wall-top wrapping.
Do not mix adhered and loose-laid wall limits
Sika Bulletin 24-01 sets a 24-inch maximum for mechanically attached, loose-laid Sikaplan or Sarnafil S 327 wall flashing. Its detail seals the roof-to-wall junction and specifies the top attachment and counterflashing. This arrangement has its own membrane and attachment scope; it is separate from the bulletin's adhered high-wall details.
A 54-inch wall illustrates the distinction. With a listed 2170 adhesive arrangement it exceeds the 45-inch threshold; with the listed 2175 arrangement it remains below 60 inches. It also exceeds the bulletin's 24-inch mechanically attached arrangement. The shop drawing should identify which construction is intended before the crew starts cutting flashing sheets.
Estimate the flashing sheet beyond its vertical rise
A shop drawing scheduling a 54-inch vertical rise and a 6-inch horizontal flange requires a 60-inch strip width before the specified joint treatment. Over a 120-foot run, that width accounts for 600 ft² of flashing sheet before end laps and corners. Taking off only the vertical face yields 540 ft² and omits 60 ft² of material.
Before counterflashing conceals the work, photograph the adhesive designation, substrate, and each row of restraint against the height marks. The parapet flashing guide explains the surrounding assembly. The tall-wall bulletin resolves whether that particular adhesive and membrane need an additional row.
Distinctions
- Counterflashing
- Counterflashing sheds water over the upper edge of base flashing. Its overlap does not replace the base flashing's specified adhesion and mechanical securement.
- Coping attachment
- A coping connection can contribute supplemental flashing securement where the selected manufacturer detail expressly allows it. Inspect the actual connection between the cap attachment and membrane.
Frequently asked questions
Is every tall wall flashing detailed the same way?
No. Membrane type, adhesive, substrate, and whether the flashing is adhered or loose laid determine the restraint arrangement. The relevant height belongs to that named system.
What should a flashing submittal identify?
Include the membrane, adhesive, substrate, finished roof elevation, wall height, attachment rows, and termination detail. These let the reviewer compare the installed geometry with the manufacturer's drawing.
Where is the extra row placed on a 54-inch adhered wall?
For the 2170 adhesive arrangement in Sika Bulletin 24-01, the wall exceeds 45 inches and the intermediate row is centered on the wall. The bulletin specifies attachment at 12 inches on center with a welded cover strip or the listed in-seam arrangement. Its wall-top wrapping exception must also be resolved in the selected detail.
Sources checked
Also defined as
- The membrane turned up a wall or curb and terminated; a primary leak source that flexes and pulls loose
- The roof membrane or metal turned up the curb, commonly at least 8 in above the finished roof