Through-wall flashing

A through-wall flashing inspection has to follow the water inside the masonry cavity: from the backing termination across the supported flashing to its outlet. BIA Technical Note 7 recommends an 8-inch minimum rise at the backing and 1-inch end dams at discontinuous runs. Verify those concealed dimensions and material-specific splices before judging the detail from its exposed drip edge or weeps.

A continuous waterproof layer built across a masonry wall that catches interior water and discharges it at weeps

Used across 3 Anvilfield field guides, most in Roofing.
Updated

Measure the back leg and the end dams

Brick Industry Association Technical Note 7, revised November 2017, recommends carrying through-wall flashing at least 8 inches vertically up the backing above its horizontal leg. Measure from the flashing's drainage level, rather than from a nearby brick joint. A mortar collection device or other cavity obstruction can require a higher termination to preserve the drainage arrangement.

BIA Technical Note 7 recommends end dams at least 1 inch high at the ends of discontinuous flashing. At a window head, the flashing extends beyond the jamb before turning upward. Photograph the completed end, including the sealed fold or preformed dam, rather than only the middle of the flashing run.

Specify the splice for the actual flashing material

BIA's 2017 guidance calls for at least a 6-inch sealed overlap between plain flexible flashing sections; it separately describes self-adhered laps as typically 3 to 4 inches, according to the manufacturer. The plain-sheet recommendation should not silently become the splice instruction for a proprietary self-adhered system.

Two plain flexible sections each 8 feet long, joined with a 6-inch overlap, provide 15 feet 6 inches of continuous flashing. They do not provide a 16-foot run. Include overlap consumption in the cutting schedule, and place the splice where workers can support, bond, and seal it before the masonry closes the cavity.

Flexible material spanning an unsupported gap can sag into a pocket or tear during construction. BIA recommends continuous support for flexible flashing across gaps and openings. Inspect corners and shelf-angle transitions for the same continuity as a straight splice. The masonry construction guide provides the surrounding wall context.

Verify the concealed drainage connection before cover

PNNL's Building America Solution Center calls for a pre-cladding inspection confirming that the water-resistive barrier overlaps the wall-base flashing. A drip edge visible outside the veneer does not establish that connection. Document the backing termination and water-resistive-barrier lap while both are accessible.

At a leaking parapet, compare the stain location with the flashing's actual ends and splices. Water can travel along the concealed horizontal surface and escape at a low corner or open end. This explains why the interior wet spot can be displaced from the opening that first admitted rain.

Put the flashing drainage level, weep inlet, and top of each end dam on the same section sketch. If a weep inlet sits above a low pocket, that pocket holds water even while the opening remains clear. Follow the pocket toward the ends and splices to identify where water can bypass the outlet; cleaning the visible weep alone does not correct that geometry.

Distinctions

Surface counterflashing
A surface cover protects the outer roof-flashing termination. It does not intercept water already traveling inside the masonry.
Cavity drainage mat
The mat keeps a drainage route open and limits mortar blockage. Flashing still provides the continuous water-collecting surface beneath it.

Frequently asked questions

Should flexible flashing project into sunlight?

Use the selected product detail. BIA recommends a durable drip edge where UV-sensitive flashing needs to remain concealed while water discharges beyond the wall face.

Can a clear weep prove that flashing is present?

It proves an opening is present. Concealed flashing continuity, backing height, and end dams need construction records or direct exposure.

Sources checked

Also defined as

  • Concrete: The continuous water-stop that collects water in the wall and directs it out
  • A concealed waterproof layer in a masonry wall that collects water and weeps it back outside

Where this shows up