Field glossary · component
Reglet
A reglet is the groove or manufactured receiver that accepts flashing at a wall. Establish its profile and installation reference before replacing metal: Elevate's two-piece detail uses a 1-inch-deep cut at least 7 inches above the cant's high point when a cant is present. Neither dimension identifies a cast-in concrete receiver, and measuring from the roof field changes the specified elevation reference.
A saw-cut groove in masonry that holds a counterflashing, sealed to keep water out of the cut
A cast-in receiver is different from a field-cut groove
Fry Reglet lists connector clips and form-attachment staples specifically for its concrete CO reglets. The clips align the receiver joints and prevent concrete leakage during pouring. Those accessories identify a receiver installed with the concrete work, rather than a groove cut into an already completed wall.
Identify the concealed engagement profile as well as the visible cover. At a repair opening, record the receiver section, embedment or cut, wall interface, and mating cover shape. These observations determine whether a compatible cover can be replaced without disturbing the receiver.
Locate the cut from the detail's actual reference
Elevate's April 2023 two-piece reglet detail calls for a 1-inch-deep sawcut or a mortar joint to receive the reglet. That dimension belongs to the illustrated receiver. It should not be transferred to another profile simply because both products are called reglets.
Elevate places that cut at least 7 inches above the cant strip's high point when a cant is used. If that high point is 3 inches above the adjacent field, the cut line must be at least 10 inches above that field. Mark both reference points on the survey; a note reading only '7 inches high' loses the datum needed to set the receiver.
Corners need a receiver detail as well as a cover detail
Fry Reglet describes its factory-fabricated reglet and flashing corners as mitered and sealed. A corner schedule therefore needs both the receiver geometry and the visible cover geometry. Ordering only a flashing corner can leave the concealed receiving line to be improvised in the field.
Inspect inside corners, outside corners, and wall ends before engaging the cover. Identify the receiver and cover corner as separate parts on the flashing detail. Elevate's two-piece instructions finish the receiver with a continuous architectural-sealant bead in its caulk cup; photograph that line where later cover work will obscure it.
Distinctions
- Counterflashing
- Counterflashing is the overlapping water-shedding cover. A reglet is its receiving feature or component, so a sound-looking cover can conceal a defective wall connection.
- Surface-mounted receiver
- A surface-mounted receiver is attached to the wall face. Its product name can include reglet terminology even though installation does not require the same groove as a cut-in receiver.
Frequently asked questions
Does replacing counterflashing require cutting a new reglet?
A compatible removable cover can use an existing sound receiver. Establish the receiver profile and condition first; the cover replacement alone does not imply a new wall cut.
What should the reglet shop drawing show?
Show the wall substrate, receiver profile, engagement, cut or embedment geometry, sealant, corners, and elevation reference. Include the mating cover so the two components can be checked together.
Is a reglet through-wall flashing?
A cut-in reglet receives the exterior flashing at a local wall groove. Through-wall flashing intercepts moisture within the wall assembly; the reglet cut depth alone does not establish that drainage path.
Sources checked
Also defined as
- A groove cut or formed in masonry that receives the top edge of a counterflashing