Counterflashing
Counterflashing is the cover that sheds water past a membrane flashing's upper termination. In Elevate's two-piece reglet system, both receiver joints and cover joints use 3-inch end laps, with their joints offset. These horizontal end laps are separate from the vertical overlap over the membrane. A 5-inch cover profile does not establish 5 inches of membrane overlap unless its installed elevations actually provide it.
Metal that overlaps and covers the top edge of a base flashing so water sheds over the face instead of behind it
Offset receiver joints from cover joints
Elevate's April 2023 two-piece counterflashing-reglet instructions specify 3-inch end laps at the receiver joints. The same Elevate detail calls for 3-inch laps between counterflashing cover pieces. Its installation sequence also directs the cover joints to be staggered relative to the receiver joints.
The offset separates two potential entry locations instead of aligning them through both layers. Mark receiver joints before hanging the cover so their positions remain available. At an inside corner or short return, lay out the pieces first; cutting the cover to match every receiver segment defeats the specified staggering.
Cover height is not the waterproofing overlap
Metal-Era's September 2024 Carlisle SecurEdge two-piece reglet submittal lists H-dimension options of 3.5, 4, and 5 inches and stock lengths of 12 feet. The catalog H-dimension describes the assembled metal profile. The overlap over the membrane still depends on the receiver elevation and the membrane's termination height.
For a 5-inch cover whose top sits 2 inches above the membrane termination, the lower edge reaches only 3 inches below that termination. This is a geometry check, not a new minimum overlap. Survey the metal and membrane from one datum, then compare that measured overlap with the selected flashing detail.
Allow for end laps in the linear takeoff
Six 12-foot cover pieces joined with five 3-inch laps cover 70 feet 9 inches, before corner cuts and end treatments. Ordering 72 linear feet of stock therefore does not provide a finished 72-foot run. Keep stock length, lap loss, and finished coverage in separate takeoff columns.
Elevate's detail engages the cover by hooking it onto the receiver and rotating it downward into place. Keep the receiver profile with the wall-flashing repair record so removal does not deform a receiver intended for reuse. A replacement order needs the mating engagement, not just the cover's exposed height.
Distinctions
- Receiver
- The receiver is the wall-mounted portion that accepts the removable cover. Leaving the receiver in place is a maintenance option only when it remains sound and compatible with the replacement cover.
- Termination bar
- A termination bar clamps the membrane to its substrate. Counterflashing covers the termination, but its presence does not prove that the membrane has been mechanically secured.
Frequently asked questions
Does a taller counterflashing always solve a low termination?
No. Compare the membrane termination, receiver, and finished roof elevations together. A taller cover changes the cover geometry without raising the waterproof membrane.
Why photograph the membrane before covering it?
The photograph records termination height and attachment that disappear behind the metal. It also establishes the reference needed to verify the finished overlap later.
Does a 3-inch joint lap establish the overlap over the membrane?
Elevate specifies 3-inch laps along the length of the receiver and cover. Vertical coverage of the membrane is a different dimension, established by the membrane termination and installed cover elevations.
Sources checked
Also defined as
- The upper metal layer that laps over the base flashing and sheds water across the termination
- The cap or unit flange that covers the top of the base flashing so water sheds over its face