Field glossary · component
Drip edge
Drip edge controls runoff at the deck edge and secures the roof-edge layers in the selected assembly. The 2025 FORTIFIED Home detail for slopes of 2:12 and greater uses 3-inch joints and fasteners no more than 4 inches apart. Those program requirements affect piece count, nail selection, and inspection photographs; identifying the metal's shape alone does not establish that its attachment or underlayment sequence complies.
Perimeter metal at eaves and rakes that kicks water off the edge and ties the roof down against wind
FORTIFIED drip-edge dimensions change the takeoff
The 2025 FORTIFIED Home Standard requires drip-edge joints to overlap at least 3 inches for the steep-slope roofs covered by its detail. It also requires the flange to extend at least 1/2 inch below the sheathing bottom and at least 2 inches back onto the roof deck. Record the governing program beside the dimensions on the edge-metal order.
A straight 120-foot run assembled from 10-foot pieces needs 13 pieces when each joint consumes 3 inches. Twelve pieces lose 33 inches at their eleven joints and finish at 117 feet 3 inches. The extra stock also has to accommodate the actual corner and end cuts; nominal linear footage is not finished coverage.
Fasteners and photographs must show the lap joints
FORTIFIED's 2025 standard limits drip-edge fastener spacing to 4 inches on center and requires two fasteners in each overlap joint. Its staggered pattern places successive fasteners near opposite sides of the roof flange. Close views are needed to resolve the spacing and the fasteners within each lap.
The 2025 FORTIFIED Home Standard specifies corrosion-resistant roofing nails with at least a 0.105-inch shank and a 3/8-inch head for this attachment, following its stated ASTM F1667 reference. It excludes cap nails and staples. A photograph showing enough fasteners still needs evidence that the fastener type matches the detail.
FORTIFIED Technical Bulletin FH 2023-02 calls for four photographs from different areas showing drip-edge installation and nailing. Plan those photographs before the roof covering hides the flange. Include a scale and the joint itself so the installation evidence captures the feature the reviewer needs to see.
Underlayment order follows the selected detail
The 2025 FORTIFIED detail places drip edge over underlayment at both eaves and rakes. Its alternate placement of self-adhered membrane above eave drip edge requires clean, oil-free metal primed with ASTM D41 primer. Put that sequence and primer designation on the installation detail rather than treating all self-adhered underlayments alike.
Put the eave and rake sequences beside each other on the installation drawing. Connect the flashing identification to the selected FORTIFIED detail, nail specification, and required photographs. Release the next covering operation only after the flange, lap joints, and fastening pattern have been documented.
Distinctions
- Gutter apron
- A gutter apron is shaped to discharge into a gutter. Compare its discharge geometry and fastening with the specified roof-edge detail before substituting it for drip edge.
- Fascia cover
- Fascia cover protects the vertical fascia face. The drip edge interfaces with the roof covering and underlayment above it, so one component does not automatically replace the other.
Frequently asked questions
Does a code-compliant drip edge automatically meet FORTIFIED?
No. A FORTIFIED project must meet its program requirements as well as the adopted code. Compare the actual lap, flange dimensions, fasteners, and installation sequence.
Can I verify the nails after shingles are installed?
Only where the installation remains observable or documented. Capture the attachment before covering it, including joints and several separate roof locations.
Sources checked
Also defined as
- Edge flashing that throws water off the deck, past the fascia, into the gutter