Field glossary · measurement

Net free area (NFA)

Net free area, or NFA, is the vent's rated unobstructed opening area. Calculate installed NFA as length times rating or unit count times rating, keeping intake and exhaust separate. Cor-A-Vent's V-600 provides 20 in² per linear foot, while S-400 provides 10 in² per foot. Twenty feet of that ridge product therefore needs 40 total feet of that soffit product to match opening area; those lengths do not establish an airflow rate.

The actual open airflow area of a vent after screen and louver, rated in square inches

Used across 2 Anvilfield field guides, most in Roofing.
Updated

Read the rating denominator on the product sheet

Cor-A-Vent rates its V-600 ridge-vent line at 20 square inches of net free ventilation area per linear foot. Cor-A-Vent rates its S-400 soffit vent at 10 square inches per linear foot. A foot of one product therefore cannot be substituted for a foot of the other when balancing opening area.

Cor-A-Vent lists its V-300 ridge-vent line at 13.5 square inches per linear foot. Replacing 30 feet of V-600 with 30 feet of V-300 changes the nominal ridge area from 600 to 405 square inches, a reduction of 195 square inches. Identical installed length does not preserve the original ventilation schedule.

Turn an attic-area target into a complete vent order

Start with the approved design ratio. For a 1,800 ft² attic scheduled at 1:300, the target is 1,800 / 300 × 144 = 864 in² of total NFA. A 1:150 schedule for that same space requires 1,728 in². The ratio comes from the adopted-code design; Cor-A-Vent's product rating determines how much vent delivers it.

Anvilfield's takeoff for the 864 in² target uses 20 installed feet of V-600 for 400 in² high and 48 total feet of S-400 for 480 in² low, totaling 880 in². Dividing the soffit length equally between two eaves means 24 feet per eave. The 400 in² upper allocation is 46.3 percent of the required 864 in², separate from its 45.5 percent share of the installed 880 in².

The attic ventilation guide and the published R806.2 text resolve eligibility for the reduced ratio. Retain that design decision with the vent order, including the vent locations and applicable climate-zone vapor-retarder condition. A numerical takeoff alone does not establish those construction details.

Order lineInstalled quantityNFA credited
High vent: V-60020 linear feet × 20 in²/ft400 in²
Low vent: S-400, eave 124 linear feet × 10 in²/ft240 in²
Low vent: S-400, eave 224 linear feet × 10 in²/ft240 in²
Installed totalCompare with required 864 in²880 in²

Do not double-count the ridge or subtract screens twice

Cor-A-Vent explicitly identifies the V-600T rating of 20 square inches per linear foot as applying when installed on both sides of the ridge. Counting 20 for each side would double the credited opening without adding any product. Preserve the manufacturer's installed configuration in the takeoff.

For a 20-foot V-600 run, keep the product rating of 400 in² on the schedule and record any blocked ridge-slot length separately. Altering the manufacturer's rating to conceal a blocked opening makes the later repair harder to verify. Keep added mesh, paint, and baffle restrictions on the same installation-defect record. NFA remains an area; an airflow result also needs pressure and flow-performance information.

Distinctions

Gross vent area
Gross area describes the overall opening or product dimensions before the obstructions represented in the NFA rating. It is not the value to enter when the schedule calls for net area.
CFM
Cubic feet per minute measures airflow. Converting NFA into CFM also requires pressure and flow-performance information; an area label alone cannot supply a ventilation rate.

Frequently asked questions

Which area goes in the upper-vent percentage?

Keep both calculations labeled. In the takeoff above, 400 / 864 is 46.3 percent of required NFA, while 400 / 880 is 45.5 percent of installed NFA. The 2021 Seattle Residential Code R806.2 expresses its reduced-ratio upper allocation against the required ventilating area.

Does a rated vent prove the attic has that much usable opening?

The rating describes the product in its intended configuration. The cut opening and the connected air path must remain unobstructed for the installed system to use it.

Sources checked

Also defined as

  • The actual open vent area air can pass through, after subtracting solid material

Where this shows up