ANVILFIELD Try FieldOS

Field glossary · material

Underlayment

For roofing, underlayment provides a drainage layer beneath the exposed covering, but attachment and sealing must be specified separately from the material name. A synthetic sheet can be mechanically fastened or self-adhered. Owens Corning's ProArmor uses cap fasteners when left exposed overnight; RhinoRoof High-Temp uses an adhesive bond and product-specific rolling. Heat resistance, exposure duration, and application temperature are separate selection checks.

The secondary water barrier under the shingles, felt or synthetic; it backs up the shingles, it is not the roof

Used across 2 Anvilfield field guides, most in Roofing.
Updated

Separate material type from attachment and sealing

Felt, synthetic sheet, and self-adhered membrane are not three mutually exclusive material categories. Synthetic describes the sheet or facer; self-adhered describes how the product bonds. The selected product's laps and penetration details determine how the installed layer handles water.

Owens Corning's ProArmor instructions require plastic or steel cap fasteners with at least a 1-inch cap diameter when the roof covering will be installed on a later day. Its RhinoRoof High-Temp instructions require a clean, smooth, dry bonding surface and prohibit plastic cap nails in that product's specified selvage fastening. Swapping products therefore changes the fastening inspection as well as the roll on the roof.

Read the basis of the high-temperature claim

Owens Corning supports RhinoRoof High-Temp's 240°F claim with modified thermal-stability testing in internal report TR2510007, October 2025. That published basis is a laboratory heat test, not an application-temperature limit. The instructions recommend applying it when air temperature is above 40°F and rising but below 100°F for best results.

At 35°F ambient temperature, the heat-test result says nothing about initial adhesion; Owens Corning warns that the sheet may not fully adhere below 40°F. Enter the test basis and the installation window in separate submittal fields. Keep the deck condition and application temperature with the installation record.

Check rolling, end laps, and joint offsets

For RhinoRoof High-Temp on slopes from 2:12 through 3:12, Owens Corning requires rolling the entire installed surface with a roller weighing at least 40 pounds. The manufacturer specifies end laps of at least 6 inches and offsets of at least 6 feet between end laps in adjacent courses. Verify each item before the covering hides the work.

A sound bond to a loose surface layer leaves the underlying defect in place. Use the deck inspection to distinguish membrane adhesion from deck integrity, then record the applicable product detail alongside the underlayment selection.

Track exposure by roof plane

Owens Corning's instructions require both ProArmor and RhinoRoof High-Temp to be covered within 90 days. The shared duration does not give them the same fastening, lap, or bond requirements. Start each roof plane's exposure clock on its underlayment installation date and close it when that area receives the covering.

Before covering, mark lifted laps, wrinkles, cuts, and damage from later trades on the roof sketch. Record the patch material and completed repair at each location. A phased project needs those dates and repair locations by area, so the first dry-in is not hidden behind the final roof completion date.

Distinctions

Self-leveling floor underlayment
A cementitious or gypsum flooring layer produces a flat substrate indoors. It has different materials, thickness limits, and moisture acceptance tests.
Pond-liner underlayment
A protective geotextile cushions a pond liner against puncture. It is not the liner that contains the water.

Frequently asked questions

Does a high-temperature underlayment replace the roof covering?

No. Both named products require the roof covering within 90 days. Their temporary exposure allowance does not make either sheet a finished roof covering.

Can an underlayment also be a vapor barrier?

Yes for RhinoRoof High-Temp: Owens Corning identifies it as a moisture and vapor barrier and requires ventilation of the covered deck and attic spaces. That property belongs in the assembly's drying design; it does not follow merely from the word synthetic.

Sources checked

Also defined as

  • The layer between the deck and the covering, the secondary water barrier and the temporary dry-in

Where this shows up

Related guides

Next step: Build a reroof list

Back to the full field glossary