Step flashing
At a shingled sidewall, step flashing must retain overlap as each new course advances: with Owens Corning Duration's 5 5/8-inch exposure, an 8-inch piece leaves 2 3/8 inches of overlap. Inspect that length together with the roof and wall legs, the concealed wall-drainage connection, and the bottom kick-out. A visible strip of metal cannot establish those hidden dimensions.
One bent metal piece per course at a sidewall, woven into the shingles, never a single caulked strip
Size the metal for the shingle exposure
Owens Corning's Duration installation instructions specify step flashing at least 4 by 4 by 8 inches and at least 2 inches beyond the shingle exposure in the direction of successive courses. That product detail establishes a measurable acceptance criterion, beyond simply seeing a metal edge beside the shingles.
At Duration's 5 5/8-inch course exposure, an 8-inch-long piece leaves 2 3/8 inches of overlap along the slope. A 7-inch piece leaves only 1 3/8 inches. Measure the actual exposure and piece length before deciding that existing flashing is suitable for a replacement shingle. Changing to a different exposure changes the overlap even when the wall length stays the same.
Open the lower wall enough to see the drainage path
PNNL's Building America Solution Center recommends ending house siding at least 1 inch above the roof surface in its step-and-kick-out flashing guide. That clearance makes the lower siding edge and flashing accessible and keeps the cladding from sitting directly on the wet roof surface. A cladding manufacturer's larger clearance remains part of the selected wall detail.
Lift or remove enough lower cladding to determine where the water-resistive barrier drains. A neat exposed metal leg does not show whether the concealed wall layer laps over it. Photograph the junction before the siding returns, including the upper leg and the route into the next downslope flashing piece. Use the flashing overview to identify adjoining apron and counterflashing details.
Check the first overlap over the kick-out
PNNL's published kick-out installation sequence laps the next sidewall-flashing section at least 4 inches over the diverter. This is the overlap at the bottom transition shown in that detail, rather than a replacement for the shingle manufacturer's course-overlap requirement farther up the wall.
Look into the gutter end, behind the diverter, and at the wall below it for staining or softened sheathing. A blocked gutter outlet or a diverter terminating behind the cladding sends concentrated water toward the wall. Keep the discharge path visible in the completion photograph, so a later gutter or siding alteration can be compared with the finished condition.
Measure the sidewall run along the roof slope before dividing by exposure. A 20-foot sloping run at 5 5/8-inch exposure spans 240 / 5.625 = 42.7 course intervals. The first course, top transition, and kick-out complete the piece schedule. A 20-foot horizontal plan dimension is a different input and must first be converted to sloping length.
Distinctions
- Headwall flashing
- A headwall crosses the top of a roof plane; its apron is a different drainage geometry from the pieces that follow successive sidewall courses.
Frequently asked questions
Can old step flashing stay during a reroof?
Expose enough to verify length, overlap, leg dimensions, condition, and integration with the wall. A change in shingle exposure can make intact existing pieces too short.
Is visible caulk evidence of a failed detail?
Locate what the sealant is sealing. The concealed overlaps and wall drainage path determine whether the detail sheds water; the appearance of a surface bead alone does not establish that path.
Sources checked
Also defined as
- Individual L-shaped pieces woven one per shingle course where a slope runs alongside a wall