Field glossary · measurement
Net free area
Net free area is the usable air opening through a particular vent or louver assembly, expressed as area rather than its outside dimensions. Greenheck’s ESD-403 example has about 0.30 square foot free area in a 12-by-12-inch face. Specify the ordered size and included accessories: using a larger unit’s free-area percentage overstates the opening available in a smaller frame.
The actual open area through a grille or louver, smaller than the nominal opening size
Why a smaller louver loses more of its face area
Greenheck reports approximately 50 percent free area for its ESD-403 louver at 48 by 48 inches. Greenheck reports approximately 30 percent free area for its ESD-403 louver at 12 by 12 inches. Frame and blade geometry occupy a larger share of the smaller face.
The large example has 16 square feet of face area and about 8 square feet of free area. The small example has 1 square foot of face area and about 0.30 square foot of free area. Applying the 50 percent value to the small unit would claim 0.50 square foot, overstating its opening by about two-thirds.
| Greenheck ESD-403 size | Face area | Approximate free area |
|---|---|---|
| 48 × 48 in | 16 ft² | 8 ft², about 50% |
| 12 × 12 in | 1 ft² | 0.30 ft², about 30% |
Calculate velocity through the opening that exists
Greenheck’s 2024 Louver Fundamentals and Selection guide calculates airflow as free-area velocity multiplied by free area. At 600 cubic feet per minute through 0.30 square foot, free-area velocity is 2,000 feet per minute. Dividing the same flow by the 1-square-foot face gives only 600 feet per minute, a different measurement.
Keep the area basis next to the velocity in the schedule. A low face velocity does not establish acceptable pressure drop or rain performance. Those require the selected louver’s performance data at the relevant airflow.
Specify what is included in the published opening
Request the free area for the ordered dimensions and accessory configuration. When a manufacturer publishes net area for a complete assembly, subtracting an assumed screen percentage again double-counts the restriction. If a screen is specified separately, obtain the combined performance rather than silently treating the blade-only figure as the finished assembly.
Roof vents are often scheduled in square inches of net free ventilating area; louvers are often scheduled in square feet. The small louver’s 0.30 square foot is 43.2 square inches, compared with 144 square inches of face area. Convert units before totaling openings, and keep intake and exhaust quantities separate where the roof design balances them.
Anvilfield’s combustion-air guide applies opening area to fuel-burning equipment. The shingle-roofing guide and attic-ventilation guide use it for roof ventilation. State the application beside the scheduled area so a roof-vent allowance does not become a combustion-air opening calculation.
Distinctions
- Face velocity versus free-area velocity
- At 600 cfm through the 12-by-12-inch example, face velocity is 600 fpm and free-area velocity is 2,000 fpm. Use the same area basis as the manufacturer’s performance curve when comparing the two readings.
Sources checked
Also defined as
- Roofing: The actual open vent area for attic ventilation, balanced intake to exhaust against the attic floor area