Ice and water shield

Ice and water shield is a self-adhered underlayment for roof locations exposed to backed-up water. Separate three product limits when planning the work: Polyglass Polystick MTS PLUS needs air, deck, and membrane temperatures of at least 40°F and rising, resists temperatures up to 265°F, and must be covered within 180 days. High-temperature service performance does not lower the temperature needed for adhesion during installation.

Self-adhered waterproof membrane at eaves, valleys, and penetrations that seals around the nails through it

Used across 2 Anvilfield field guides, most in Roofing.
Updated

What ASTM D1970 establishes

ASTM D1970/D1970M-25 covers self-adhered polymer-modified bituminous sheet underlayments used at roof eaves and valleys to resist leakage from ice-dam water backup. Its public description includes adhesion to plywood, thermal stability, flexibility, tear resistance, and sealability among the physical requirements. Identify the actual edition in a submittal instead of writing only "ASTM compliant."

The specification addresses the underlayment material. The selected product instructions still establish how that sheet is applied to the actual deck and how it interfaces with adjoining courses. A nail-sealability result also does not turn a misplaced hole, an unsealed cut, or a wrinkle into an acceptable installation detail.

Installation temperature and service temperature are separate

Polyglass requires Polystick MTS PLUS application on a dry substrate with air, deck, and membrane temperatures at 40°F and rising. Measure shaded decks and cold stored rolls directly because their temperatures can lag behind the afternoon air. A roll's storage temperature belongs in that check alongside the deck reading.

Polyglass rates Polystick MTS PLUS for temperature resistance up to 265°F. That high-temperature property addresses conditions beneath roof coverings such as metal; it does not permit application below the product's minimum installation temperature. Record the exact membrane designation because similarly named underlayments serve different temperature exposures.

Exposure time belongs in the roofing schedule

The Polystick MTS PLUS data sheet requires covering the membrane within 180 days of installation, unless the authority having jurisdiction imposes a shorter period. Its exposure allowance is a construction scheduling limit, not a service-life rating for leaving the membrane as the finished roof.

Record phased installation by roof area

Mark installation dates by roof area when work proceeds in phases. Photograph laps before the next course hides them, and record repairs after other trades cross the deck. Carry those area identifiers into the steep-slope roof record so each covering date resolves the exposure period for the membrane beneath it.

Distinctions

Ordinary synthetic underlayment
A mechanically fastened synthetic sheet does not become a self-adhered ice barrier merely because both products go beneath shingles. Match the specified water-backup function and attachment type.
High-temperature underlayment
High-temperature describes a product performance limit. It is separate from the minimum temperature for adhesion and from the permitted period of exposure before covering.

Frequently asked questions

Can ice and water shield stay exposed permanently?

Use the product's exposure limit and covering requirements. Polystick MTS PLUS has a 180-day covering limit in its data sheet; that does not make it a permanent exposed roof membrane.

Why can a roll fail to bond on a warm day?

Deck and membrane temperature can lag behind air temperature, and moisture or contamination can prevent contact. Polyglass's stated temperature condition applies to all three, with a dry substrate.

Does ASTM D1970 tell me the installation temperature?

ASTM D1970/D1970M-25 specifies material performance. The selected product supplies its application conditions: Polystick MTS PLUS requires a dry substrate and air, deck, and membrane temperatures of 40°F and rising.