Field glossary · process
Ice dam
An ice dam is a refrozen obstruction fed by snowmelt from a warmer part of the roof. University of Minnesota Extension identifies the relevant split as sustained roof-surface temperatures above 32°F upslope and below 32°F lower down. A 25°F outdoor reading therefore cannot establish a cold roof. Diagnose the roof's melt-and-freeze pattern separately from tracing where backed-up water entered the building.
A ridge of ice at the cold eave that backs meltwater up under the shingles into the building
Measure a temperature pattern, not a single reading
University of Minnesota Extension describes ice-dam formation as sustained upper roof-surface temperatures above 32°F with lower roof surfaces below 32°F while snow is present. An outdoor air reading below freezing does not prove that the entire roof surface is below freezing.
For readings of 25°F outdoors, 35°F at the upper roof, and 28°F at the eave, the roof surfaces straddle the melt threshold. Repeat the observations to establish the sustained pattern described by Minnesota Extension. Record the surface and instrument: an attic-side sheathing temperature and a reading at the roof-snow interface describe different locations.
Snow can insulate the warm roof surface
PNNL's ice-dam prevention guidance gives snow an approximate insulation value of R-1 to R-2 per inch. Added snow can therefore reduce heat loss from the roof surface to outdoor air while indoor heat continues to reach that surface. Deep snow and low outdoor temperature do not guarantee a cold deck. Ten inches of snow at that range contributes roughly R-10 to R-20; snow depth belongs in the temperature record.
Compare where snow remains with where it repeatedly melts. A narrow melt path above a chase, chimney enclosure, or duct route suggests a localized heat source. A broad pattern suggests a larger thermal or air-leakage condition. Carry the observations into the ice-dam field guide with the interior locations marked on the same plan.
Do not substitute an attic fan for the heat diagnosis
University of Minnesota Extension does not recommend mechanical attic ventilation as an ice-dam solution in Minnesota because it can create moisture problems and undesirable negative pressure in the home. A fan changes pressure as well as temperature, so its installation is not evidence that the underlying heat path has been corrected.
Keep the heat-loss investigation separate from documenting the water-entry route. Water backing up behind ice can enter above the location of the ceiling stain. Record the ice line, damaged finishes, and observed roof defects without assuming that the stain sits directly below the entry. The thermal correction and waterproofing repair address different parts of the failure.
Distinctions
- Icicle
- An icicle records freezing runoff at an edge. Determine the extent of trapped water from the ice obstruction and drainage path, not the icicle's length.
- Snow retention
- Snow-retention hardware controls sliding snow and ice. It does not remove the heat source that produces melting beneath a snow layer.
Frequently asked questions
Which temperatures belong in an ice-dam inspection record?
Keep outdoor air, upper roof surface, and eave surface readings separate, with location, method, snow depth, and time. Minnesota Extension describes a sustained temperature split across the roof, so a single attic-side reading cannot establish the condition at the snow-to-roof interface.
Sources checked
Also defined as
- Refrozen meltwater at the cold eave that backs water up and loads the gutter