Vapor retarder

A vapor retarder controls diffusion through a layer, with its resistance reported as permeance at a stated thickness and test exposure. At equal area and vapor-pressure difference, a 0.1-perm layer transmits one-tenth as much vapor as a 1-perm layer. A humidity-responsive sheet changes that rate as conditions change, so its dry-cup rating and wet-cup drying behavior belong together in the specification.

A layer that slows water vapor diffusion through the assembly, rated by perm; a vapor barrier is the lowest-perm version, Class I at 0.1 perm or less

Used across 5 Anvilfield field guides, most in Roofing.
Updated

Read the test conditions beside the perm rating

ASTM E96/E96M-24a provides two basic gravimetric methods for water-vapor transmission: the desiccant method and the water method. Both determine transmission from mass change under a controlled vapor-pressure difference. A handheld moisture-meter reading in the wall is not a field measurement of the sheet's permeance.

ASTM E96/E96M-24a requires the test conditions to accompany the result because changing the method or humidity exposure can change the measured transmission. Preserve the report's temperature and relative humidity on both sides of the specimen. A specification calling for dry-cup data cannot be satisfied by relabeling the same sheet's higher wet-cup result.

Carry the tested thickness and whether the result applies to a film, coating, facing, or finished composite. A coating's application rate determines the thickness actually installed. A facing tested alone does not establish the vapor resistance of an entire wall, and a result for one thickness should not be silently assigned to another.

Why a smart membrane has both a low and a high number

CertainTeed describes polyamide smart vapor retarders that measure 1 perm or less by the dry-cup method and more than 10 perms by the wet-cup method. The film responds to moisture by becoming more vapor-open. Those values describe its intended response, rather than conflicting measurements of an unchanging property.

Retain both values in the assembly review. A low dry-cup number describes resistance under dry exposure; the higher-humidity result describes a drying route under another condition. CertainTeed says these polyamide films perform poorly in continuously humid pool and spa environments because the film stays vapor-open. Identify indoor humidity in the roof moisture-control assembly rather than treating every conditioned interior alike.

Turn permeance into a diffusion quantity

Using the US-perm definition documented by CertainTeed, a 1,000-square-foot sheet at 0.1 perm with a 0.2-inch-Hg vapor-pressure difference transmits 20 grains per hour under steady conditions. NIST's conversion of 64.79891 milligrams per grain makes that approximately 1.30 grams per hour. The calculation multiplies permeance, area, and vapor-pressure difference.

Changing the pressure difference or exposed area changes that diffusion quantity even when the material is unchanged. This makes a product's perm rating one input to an assembly calculation, rather than a daily moisture allowance for the building. Record the physical layer and test report with the envelope specification.

Distinctions

Permeability
Permeability describes material transport normalized for thickness. Permeance describes the particular layer or product thickness tested.
Under-slab sheet grade
A sheet grade for tensile and puncture resistance addresses mechanical durability. Specify that performance separately from the permeance required for moisture control.
Air barrier
A low-perm laboratory specimen says how vapor diffuses through the material. An unsealed seam or penetration can still carry humid air around it; the air-control detail must close that route.

Frequently asked questions

Does a lower dry-cup perm rating always improve the assembly?

It reduces diffusion under that test condition. Assembly selection also depends on the directions in which wet materials must dry and on the membrane response at higher humidity.

Where is the vapor-retarder value measured?

A laboratory tests a defined specimen under controlled exposure. The installed record identifies the matching product, thickness, and continuity details for the actual assembly.

Sources checked

Also defined as

  • Concrete: ASTM E1745 plastic sheet under the slab that blocks ground moisture from reaching the floor finish
  • Concrete: Sheet under the slab that blocks ground moisture but seals the bottom and can worsen curling