Field glossary · measurement
Perm
A U.S. perm expresses water vapor permeance through a specimen at its tested thickness. One perm is approximately 57.2 ng/(Pa·s·m²). Carry the cup method, temperature and humidity conditions with the reported value. A number in perm-inch includes material thickness, while a vapor transmission rate also depends on the pressure difference. Those quantities need different units and cannot be compared as bare numbers.
The unit of water vapor permeance, measured by ASTM E96; lower perm resists diffusion more
Convert U.S. perms to SI permeance
NIST Special Publication 811 converts one U.S. perm, using the 0°C mercury-pressure definition, to 57.2135 ng/(Pa·s·m²). Multiply U.S. perms by about 57.2 to obtain that SI permeance unit. A 0.1-perm result becomes approximately 5.72 ng/(Pa·s·m²), while 10 perms becomes approximately 572 ng/(Pa·s·m²).
The 0°C designation identifies the mercury reference used in defining the pressure unit. It does not mean the specimen was tested in a freezing chamber. Preserve the actual test temperature separately when comparing a metric data sheet with an inch-pound specification.
Dry cup versus wet cup: compare the humidity conditions
ASTM E96/E96M-24a is the active edition of the gravimetric water vapor transmission test as of November 5, 2026. It identifies desiccant and water methods and requires the test temperature and side-to-side humidity conditions to accompany the results. Its public scope and significance statement also explains that changing methods or conditions changes what the result represents.
Building Science Corporation's June 2003 paper hosted by DOE describes dry-cup conditions of 0 and 50 percent relative humidity and wet-cup conditions of 50 and 100 percent. The average humidity is therefore 25 percent for that dry-cup setup and 75 percent for that wet-cup setup, despite the same 50-percentage-point difference. ASTM E96/E96M-24a permits other test conditions, so identify the actual procedure on the report.
The National Bureau of Standards' 1972 certificate for reference material SRM 707 assigned its PET film 0.66 ± 0.03 perm by dry cup and 0.72 ± 0.03 perm by wet cup under ASTM E96-66. These are archived measurements of one reference film, not a conversion factor between methods.
Compare alternate products using matching methods and exposure conditions. Add the test report beside the layer schedule from the roof vapor retarder guide; it identifies which humidity exposure the submitted perm value represents.
| Cup setup described by BSC/DOE | RH on the two sides | Mean RH |
|---|---|---|
| Dry cup with desiccant | 0% and 50% | 25% |
| Wet cup with water | 50% and 100% | 75% |
Perm-inch versus perms at the installed thickness
Permeability in perm-inch characterizes vapor transfer through the material with thickness included. For a homogeneous flat layer under the same test conditions, divide permeability by thickness in inches to calculate permeance in perms. A faced or laminated product needs the rating for its actual construction because the layers add separate vapor resistances.
DOE's May 2012 Hybrid Foundation Insulation Retrofits guide reports one closed-cell spray foam at 1.51 perm-inch by dry cup, with permeance of 1.51 perms at 1 inch and 0.76 perm at 2 inches. The arithmetic is 1.51 / 2 = 0.755, rounded to 0.76. For this foam, a specified maximum of 1 perm needs at least 1.51 inches on permeability arithmetic; the documented 2-inch result meets it. Use the submitted product's own data for the thickness selection.
This distinction matters when a pipe insulation submittal reports permeability but the specification asks for a layer's permeance. Keep the product construction and thickness beside the number before judging whether the submitted property answers the specification.
Calculate vapor flow from a perm rating
For 1,000 ft² of intact material rated 0.5 U.S. perm under a steady 0.2 in. Hg vapor-pressure difference, the calculation is 0.5 × 1,000 × 0.2 = 100 grains per hour, or 2,400 grains per day. This applies the U.S. perm relation documented in the NBS SRM 707 certificate to an installed area.
NIST SP 811 converts one grain to 64.79891 mg, making that daily flow about 156 g. Doubling the pressure difference to 0.4 in. Hg doubles the calculated flow to about 311 g/day at the same permeance. Neither result includes water carried through open joints. File the calculation with the moisture and installation records covered by the roof deck guide and under-slab vapor barrier guide.
Distinctions
- Water vapor transmission rate
- A rate reported in grams per square meter per day describes mass transfer per area and time. Converting it to permeance also requires the vapor-pressure difference used in the test.
Frequently asked questions
Does a roof moisture meter measure perms?
A field moisture reading does not supply an ASTM E96 laboratory permeance result. Obtain the product's test report for its perm rating and keep the deck or insulation moisture readings in the installation record.
Sources checked
- ASTM E96/E96M-24a: active edition, test methods and reporting conditions
- NIST SP 811 Appendix B.9: perm and grain conversion factors
- NBS SRM 707 certificate, January 17, 1972: dry-cup and wet-cup values and U.S. perm definition
- DOE Building America: Hybrid Foundation Insulation Retrofits, May 2012, Table 1, page 13
- Building Science Corporation / DOE: Insulations, Sheathings and Vapor Diffusion Retarders, June 2003, page 2, cup-test humidity conditions
Also defined as
- Concrete: Permeance unit, grains of water vapor per hour per square foot per inch of mercury; 0.1 perms or less marks a vapor barrier
- Unit of vapor permeance; a vapor retarder over concrete is commonly below 0.01 perm