MVER

MVER, moisture vapor emission rate, reports water leaving concrete in lb/1,000 sq ft/24 h, so a reading of 6 uses the same reporting basis in a small room as in a warehouse. It is not 6% moisture. ASTM F1869-23 reports the surface condition at testing. For an acceptance comparison, MAPEI's August 2025 Ultrabond ECO 373 sheet permits up to 15 lb/1,000 sq ft/24 h while imposing separate RH and pH limits.

Moisture vapor emission rate, pounds per 1000 square feet per 24 hours, from the ASTM F1869 calcium chloride test

Used across 3 Anvilfield field guides, most in Concrete.
Updated

Keep all three parts of the MVER unit

Write the report heading as lb/1,000 sq ft/24 h so a value such as 6 remains identifiable when copied into a submittal. Do not multiply the acceptance limit by the room area: the test and the product threshold already use the same normalized area.

ASTM F1869-23 defines the reported quantity as the equivalent mass emitted from 1,000 sq ft in 24 hours. The time in that unit is a normalization interval, not an instruction to expose the test for one day. The F1869 test entry covers exposure, weighing and the kit calculation.

ASTM F1869-23 describes the result as the surface condition at the test location and time. A low result after temporarily drying the room is not evidence of the slab's future emission under different service conditions. Attach the test temperature and humidity record when comparing results from separate visits.

Use a product limit with its publication date

The Ultrabond ECO 373 data sheet, edition date August 6, 2025, sets a 15 lb MVER ceiling under ASTM F1869. MAPEI also sets a separate 99% in-slab RH ceiling under ASTM F2170 for that adhesive.

MAPEI excludes Ultrabond ECO 373 use when slab pH is 12 or higher. A passing emission result therefore answers only one of the product's substrate-condition questions. Retain the RH and pH results beside it instead of converting either into an assumed equivalent MVER.

For ECO 373, MAPEI also excludes known hydrostatic moisture problems, osmotic blistering and alkali-silica reaction. Its high published moisture tolerance does not turn the adhesive into a repair for those conditions. Put the selected adhesive beside every preparation layer in the resilient-flooring assembly so each layer retains its own acceptance reference.

Read a result against three independent limits

An area records MVER 12 lb/1,000 sq ft/24 h, in-slab RH 96% and pH 11. Compared with the cited ECO 373 sheet, the first value is 3 lb below its emission ceiling, the second is 3 percentage points below its RH ceiling, and the pH is below 12. If only the pH changes to 12, the area fails that adhesive's pH condition despite the unchanged moisture results.

Record three separate decisions against the location identifier: MVER acceptance, RH acceptance and pH acceptance. These comparisons address only those three published conditions; temperature, substrate suitability and the other specified floor layers retain their own acceptance checks. No RH-to-MVER conversion supplies a missing result.

ECO 373 substrate measurementPublished limitResult at the limit
MVER15 lb/1,000 sq ft/24 h maximum15 is within the emission limit.
In-slab RH99% maximum99% is within the RH limit.
pHLess than 1212 is excluded.

Distinctions

Moisture content
Describes water quantity relative to a material quantity. MVER describes mass crossing a surface over time.
Vapor pressure
Describes a pressure condition. MVER reports an emission rate and does not measure pressure beneath a coating.

Frequently asked questions

Does every floor require an MVER below 3 pounds?

The specified products establish their limits. The cited ECO 373 sheet allows up to 15 lb/1,000 sq ft/24 h; that number belongs to that adhesive and its stated application conditions.

Can an MVER result be expressed as percent RH?

They are different physical quantities. Obtain the in-slab RH measurement required for the system rather than assigning a percentage to the emission rate.

Sources checked

Also defined as

  • Moisture vapor emission rate in lb per 1000 sf per 24 hr from the surface (ASTM F1869)

Where this shows up

Related guides

Next step: Build a retail-floor territory

Back to the full field glossary