Field glossary · property
SSD
SSD, saturated surface dry, has two field uses: an aggregate moisture reference for batch-water calculations and a wetted substrate condition for cementitious repairs. Both distinguish water held in accessible pores from water on the outside. A measured aggregate moisture percentage supports a numerical correction; a repair crew must verify pore wetting and remove surface films at the time mortar is placed.
Saturated surface dry, the aggregate moisture baseline used to correct batch water for free or absorbed moisture
How to check SSD before placing repair mortar
SikaTop-123 Plus instructions require an SSD substrate with clean water and no standing water during application. Inspect the bottom of a cavity, horizontal ledges, and the area behind exposed bars for retained water after the surrounding face has drained. Remove that free water without leaving the prepared area to dry before placement.
A matte surface alone does not demonstrate saturated pores; dry concrete also looks matte. Document prewetting and inspect again immediately ahead of the mortar crew. In a repair cavity, water can collect in low pockets while an exposed edge dries, so make the decision over the whole bonding surface rather than at one convenient point.
SikaTop-123 Plus also requires mortar to be scrubbed into the substrate to fill pores and voids. SSD preparation and the scrub coat serve different functions: wetting controls water exchange, while scrubbing establishes contact with the prepared surface. A water sheen cannot serve as a bonding coat.
Use oven-dry mass as the percentage base
ACI Education Bulletin E1-16 calculates aggregate absorption and total moisture relative to oven-dry aggregate mass. Surface moisture is total moisture minus absorption on that same basis. Applying the percentage to wet mass or SSD mass without conversion produces the wrong water correction.
Let A be absorption as a decimal fraction, T total moisture, and M the oven-dry aggregate mass. SSD mass is M x (1 + A); wet batch mass is M x (1 + T); water relative to SSD is M x (T - A). A positive result is free surface water; a negative result is a deficit relative to the laboratory absorption condition.
ACI E1-16 explains that its 24-hour absorption reference can exceed the water an aggregate takes up before concrete sets. A negative moisture correction therefore identifies the laboratory SSD deficit, not a measured promise of immediate uptake during mixing. Establish how the selected aggregate is conditioned when setting its batch-water adjustment.
ASTM C127-25 determines coarse-aggregate relative density and absorption after prescribed soaking. It explains that different conditioning methods can produce different absorption values. The laboratory reference and the current stockpile moisture must therefore be identified separately.
Correct a batch specified as 1,000 kg SSD sand
The mixture calls for 1,000 kg of SSD sand. Its measured absorption is 2% and current total moisture is 5%, both on the oven-dry basis. Oven-dry sand mass is 1,000 / 1.02 = 980.39 kg. The corresponding wet batch mass is 980.39 x 1.05 = 1,029.41 kg.
That wet sand contributes 980.39 x (0.05 - 0.02) = 29.41 kg of free water. Subtract 29.41 kg from the separately added mixing water while batching 1,029.41 kg of the wet sand. Subtracting 3% of the 1,000 kg SSD target would give 30 kg and quietly use the wrong denominator.
SSD density and apparent density count different volumes
ASTM C128-25 distinguishes SSD relative density from apparent relative density, which excludes water-accessible pore space inside the aggregate particles. Those values are not interchangeable in an absolute-volume mixture calculation.
A damp-looking stockpile is not a quantitative SSD measurement. Use the moisture determination and the identified absorption value when changing batch masses. A laboratory density result and a stockpile moisture result belong to different measurements even when both are used on the same batch sheet.
Write the calculated stockpile correction on the concrete batch record, including the absorption value and measured total moisture. Keep that numerical correction distinct from an SSD surface requirement in cementitious grouting, where the placement concern is water exchange at the bonding interface.
Distinctions
- Oven dry
- Oven-dry aggregate has had its removable water driven off under the test conditions. Its mass is the denominator for the moisture percentages used here.
- Surface wet
- Surface-wet aggregate carries water beyond its absorbed content. That excess contributes to mixing water and changes the batch correction.
Frequently asked questions
Is all water inside wet aggregate counted as mixing water?
No. The absorbed portion is distinguished from free surface moisture. The latter is the stockpile contribution used in the water correction.
Does a 24-hour aggregate absorption test set the repair prewetting time?
No. The absorption test establishes an aggregate reference mass. The selected repair mortar's instructions establish substrate preparation; SikaTop-123 Plus requires SSD with no standing water during application.
Sources checked
Also defined as
- Datacenter: Saturated surface dry, the concrete moisture state for cementitious grout: soaked but no standing water
- Saturated surface dry, the slab damp through the surface with no standing water before the bond coat