Non-shrink grout
Non-shrink grout is a bearing-fill material qualified for height stability, with each water consistency carrying its own flow and yield. SikaGrout-212, for example, yields 0.44 cubic foot per 50-pound bag at fluid consistency. An ASTM C1107/C1107M certificate establishes cement-grout qualification; actual batch water and evidence of complete filling are still needed to accept the installed baseplate.
Grout built so controlled expansion offsets shrinkage, holding contact under a plate; ASTM C1107
What the current non-shrink specification covers
ASTM C1107/C1107M-26 is the current specification for packaged dry hydraulic-cement grout intended to support applied loads without a reduction below its initial placed height under the specified test conditions. It covers a dry cement-based product requiring added water. Resin-based epoxy grout needs its own material qualification; an epoxy product cannot establish compliance merely by using the words non-shrink.
A material certificate and a placement record answer different questions. The certificate identifies the grout's qualified properties. The placement record must show that the actual water content, consistency, temperature, gap, and curing correspond to the selected material. Neither document alone proves complete contact under a plate.
Flow, water, and yield belong on the same batch sheet
SikaGrout-212 product data specify 6 pints of water for plastic consistency, 6.5 pints for flowable consistency, and 8.5 pints for fluid consistency per 50-pound bag. Select the consistency required for the placement geometry before batching, rather than increasing water until the material looks easy to pour.
SikaGrout-212 lists a nominal yield of 0.44 cubic foot per bag at fluid consistency. Its published neat application thickness is 1/2 to 4 inches. A deep pocket, a shallow feather edge, and a broad baseplate therefore need their dimensions reconciled with the product limits before bag quantities are finalized.
A 30-by-30-inch plate with a uniform 1.5-inch gap contains 1,350 cubic inches, or 0.78125 cubic foot, below the plate. Dividing by the stated 0.44-cubic-foot yield gives 1.78 bags. Two bags cover that ideal void volume, but the headbox, formed shoulders, pockets, and waste must be added to the measured quantity.
Locate the gap that a strength result cannot explain
When a base sounds hollow or fails to take load uniformly, distinguish incomplete filling from a height-change problem. Entrapped air, a blocked flow path, or a low spot that never received grout can leave a void even when test specimens achieve their required compressive strength.
In a baseplate grouting record, put selected consistency and actual mixed volume beside discharge and return-flow locations. Carry that placement evidence into equipment anchor and grout acceptance so a later investigator can evaluate filling as well as the bag label.
Distinctions
- Epoxy grout
- Epoxy grout uses a resin binder and its own product qualification and placement requirements. C1107/C1107M concerns hydraulic-cement grout.
- Compressive strength
- Strength describes resistance to crushing under a test load. It does not establish the bearing area actually filled beneath a plate.
Frequently asked questions
Can high grout strength justify a hollow baseplate?
A specimen result cannot replace verification of contact beneath the plate. The support detail depends on both material performance and the installed bearing area.
Does every non-shrink grout use the same water quantity?
No. The water quantities above belong to SikaGrout-212 and its stated consistencies. Record the exact selected product and batch water.
Sources checked
Also defined as
- Datacenter: Grout that does not lose height as it cures, so it keeps contact under the plate (ASTM C1107)
- A specified volume-stable grout used under its tested placement and curing conditions