Post-installed anchor

Post-installed anchors connect to hardened concrete by expansion, screw engagement, undercut bearing or an adhesive bond. Identify the mechanism before selecting the inspection record: a torque-controlled expansion anchor needs its qualified hole and setting torque, while an adhesive system also depends on hole condition, resin and cure history. The evaluation report defines which substrate, drilling method and installation geometry belong to that exact product.

Anchor placed in hardened concrete in a drilled hole, mechanical or adhesive

Used across 2 Anvilfield field guides, most in Concrete.
Updated

Which anchor mechanism is on the drawing?

Hilti KB-TZ2 is a torque-controlled expansion anchor under ESR-4266; Hilti HIT-RE 500 V3 is an epoxy anchoring system under ESR-3814. Their report requirements show why one anchor checklist cannot establish both installations.

Hilti's mechanical-versus-adhesive comparison attributes expansion-anchor tension resistance to friction generated by expansion pressure, screw and undercut resistance to interlock, and adhesive resistance to bond. Retain the mechanism in the inspection plan so the observed setting operation matches the intended force transfer.

MechanismPrimary tension resistanceConcealed installation evidence
ExpansionExpansion pressure and friction against the hole wallQualified bit, hole dimensions, embedment and setting torque
Screw or undercutThread or undercut bearing in concreteProduct-specific hole geometry and setting method
AdhesiveBond between steel, resin and concretePermitted hole condition, cleaning, resin identity and full cure

Read the substrate limits before the capacity table

ICC-ES report ESR-4266, revised October 2026, qualifies Hilti KB-TZ2 anchors in cracked and uncracked normal-weight and lightweight concrete with specified compressive strength from 2,500 to 8,500 psi. Within its referenced ACI 318-19 design provisions, the report caps the concrete strength used in anchor calculations at 8,000 psi. Eligible substrate strength and calculation input are separate limits.

The same report identifies its code basis as the 2024 IBC and ACI 318-19. ACI CODE-318-25 is the newer published concrete code, but it does not silently replace the edition stated in an evaluation report. Keep the report revision with the submitted anchor calculation.

A drilling method is part of the qualification

ESR-4266 excludes hollow drill bits for the 1/4 inch and 3/8 inch KB-TZ2 sizes. It separately excludes the specified Hilti SPX-T core-bit installation for the 1/4 inch and 1 inch sizes. Permission to use a particular drilling system on one diameter is not permission for the whole product family.

Record the bit system and hole dimensions before installation conceals them. A finished nut and washer cannot show whether the hole came from the approved process. Include those observations in the anchor installation records, identified to the anchor mark used on the drawing. This connects the concealed hole to the qualified variant actually installed.

Concrete over metal deck has another interface

For KB-TZ2 soffit installations in concrete on steel deck, ESR-4266 requires carbon-steel anchors and concrete with at least 3,000 psi specified strength. The 2,500 psi lower bound for the report's general concrete anchorage does not apply to this deck condition. ESR-4266 also limits the steel-deck opening to the concrete-hole diameter plus 1/8 inch and supplies profile, thickness and edge-distance restrictions.

Keep the deck profile and anchor position on the as-built record along with the concrete thickness above it. The top of a rib, its sloping side and its soffit are different geometries. A capacity taken from a solid-concrete slab detail does not identify the approved deck installation.

Adhesive readiness depends on full cure

ESR-3814, revised May 2025, distinguishes initial and final cure for HIT-RE 500 V3 post-installed rebar. Initial cure permits the stated rebar and formwork preparation; torque or load must wait until final cure. Enter the concrete temperature and the matching cure-time condition from the installation instructions in the anchor record.

ESR-3814 requires continuous special inspection for horizontal or upwardly inclined adhesive installations resisting sustained tension. By contrast, ESR-4266 calls for periodic inspection of the KB-TZ2 installation under its stated IBC provisions. Identify the product, load condition and orientation before scheduling inspection coverage.

Distinctions

Nominal and effective embedment
Different dimensions used by the product detail and design model. Neither is simply the overall anchor length minus the exposed thread.
Adhesive anchor
Depends on the qualified adhesive, rod and hole condition. Mechanical-anchor drilling permissions do not establish an adhesive system installation method.

Field example

An approved soffit installation has a 1/2 inch concrete hole. ESR-4266's deck-hole rule permits a steel opening no larger than 5/8 inch. A 3/4 inch opening exceeds that allowance by 1/8 inch even if the anchor reaches its specified embedment.

Frequently asked questions

Does a larger anchor automatically solve an unsuitable installation?

Increasing diameter changes hole size, edge distances, spacing and the qualified installation options. Reconcile the changed assembly with its report and approved design rather than carrying over the smaller anchor detail.

Sources checked

Also defined as

  • Datacenter: Anchor set in a drilled hole after the concrete cures (adhesive, mechanical expansion, or screw)

Where this shows up

Related guides

Next step: Find equipment retrofit bids

Back to the full field glossary