Field glossary · code or standard
ESR
An ESR is an ICC-ES evaluation report documenting how a particular building product meets the codes and acceptance criteria identified in that report. Its scope extends beyond anchors to products such as wall systems, roofing and fasteners. Read the evaluated property, report revision and conditions of use together: possession of an ESR number does not extend the findings to every application of the product.
ICC-ES evaluation report stating a post-installed anchor's seismic and cracked-concrete qualification and its capacities
Find the evaluated property before the design tables
ICC-ES's report-reading guide separates Evaluation Scope, Properties Evaluated and Uses into distinct fields. A report evaluating structural behavior does not, by that fact alone, establish fire resistance, durability in a different exposure or another unevaluated property.
The same guide identifies Conditions of Use as the place where the report's qualifying conditions are collected. Begin there before extracting a favorable table value. For concrete anchor work, attach the evaluated product identity and applicable conditions to the installation record before accepting a table value for the connection.
An ESR number stays the same while its revision changes
ICC-ES ESR-3814 for Hilti HIT-RE 500 V3 was reissued in January 2025, revised in May 2025 and marked for renewal in January 2027. These three dates describe different events. Save the actual revision used for the submittal, rather than recording only the report number.
ESR-3814's May 2025 revision evaluates the 2024, 2021, 2018 and 2015 IBC and IRC editions, with the main references written for the 2024 codes. Its previous-edition tables translate the applicable code references. A project using an earlier adopted edition needs that mapping, not an assumption that the newest code reference printed on the first page controls the permit.
What the supplements and identification section add
The first page of ESR-3814 identifies a City of Los Angeles supplement and a Florida supplement with HVHZ coverage, and points separately to ELC-3814 for Canadian code references. Keep the applicable supplement in the review package so a reviewer can see the jurisdiction-specific evaluation alongside the base report.
ICC-ES explains that the Identification field supplies the markings used to match delivered material to the evaluated product. Make the receiving record a direct comparison: package identification, proposed application, adopted code edition and saved report revision. A purchase substitution then has four specific items to reconcile instead of an ESR number copied from the original submittal.
Distinctions
- Acceptance criteria
- Criteria describe the evaluation basis for a product category. The ESR records the findings and conditions for an identified product evaluated against that basis.
Frequently asked questions
Is an ESR the same as project approval?
An ESR supplies evidence for the code official's review. The proposed assembly still has to match the report's scope, the approved project documents and the conditions attached to that use.
Sources checked
Also defined as
- Concrete: ICC-ES evaluation report, the qualification document with capacities and install rules