Ip

Ip is the seismic component importance factor assigned on the nonstructural equipment schedule. ASCE 7 uses 1.0 for ordinary components and 1.5 for specified life-safety, hazardous-substance, or essential-facility functions. Record the reason for that assignment alongside the equipment model and required post-earthquake outcome. A containment requirement and an operability requirement call for different evidence even when both components carry Ip = 1.5.

Component importance factor in ASCE 7, commonly 1.0 or 1.5, where 1.5 means the equipment must function after the quake

Used across 2 Anvilfield field guides, most in Datacenter.
Updated

What makes a component Ip 1.5?

Portland's Code Guide 17-11 summarizes four triggers under ASCE 7-10 Section 13.1.3: post-earthquake life-safety service; toxic, highly toxic, or explosive contents exceeding the applicable hazard threshold; equipment needed to sustain a Risk Category IV facility; and hazardous-substance components in a designated hazardous occupancy. List the qualifying function and contents for the specific component, rather than assigning importance from the building's business name.

Portland's online guide expressly references ASCE 7-10. For a project using ASCE 7-22, record that edition and its adopted amendments on the schedule; UFC 3-301-01 Change 6, dated January 30, 2026, provides public guidance on ASCE 7-22 equipment certification. Keep the local guide's edition and stated scope visible when using its assignment and certificate examples.

Continued operation and containment are different acceptance goals

UFC 3-301-01 Change 6 explains ASCE 7-22 certification for equipment required to remain operable after the design earthquake: use shake-table testing or experience data unless inherent ruggedness is established. Identify the component's designated seismic function and applicable certification scope before requesting that evidence. An attachment calculation establishes a different part of the submittal from evidence that the equipment operates after shaking.

The same UFC explains that ASCE 7-22 permits analysis, approved testing, or experience data to establish post-earthquake containment for hazardous-substance components assigned Ip = 1.5. Containment and operation therefore have different qualification paths. State which outcome the component must achieve before asking for a generic 'seismic certificate.'

Match the certificate to the installed configuration

For its stated local code scope, Portland's Guide 17-11 lists SDS, z/h, Ip, and the qualification method among certificate contents. Read SDS as the design short-period spectral acceleration and z/h as installation height divided by building height. Both demand parameters affect the certificate comparison independently of the assigned importance factor.

Compare the actual model, operating mass, mounting orientation, support arrangement, and attached accessories with the accepted package. A roof-mounted unit and a grade-mounted unit can share an Ip while having different seismic demands. Include this certificate comparison in the seismic anchoring submittal so the reviewer can connect the equipment evidence to the actual mounting detail.

Keep the component schedule separate from enclosure ratings

An equipment schedule should distinguish the building risk category, seismic design category, assigned Ip, qualification reference, and attachment detail. The building category informs the design but does not turn every component into an identical seismic case. A decorative cover and the emergency power equipment behind it do not necessarily share the same required function.

IP followed by digits on an enclosure concerns ingress protection. Network IP concerns Internet Protocol. Neither supplies the seismic Ip used in the structural calculation. Preserve the lowercase subscript or spell out 'component importance factor' when transferring data between architectural, electrical, and structural schedules; capitalizing every field can erase this distinction.

Distinctions

Ip versus SDS
Ip classifies the component’s importance. SDS expresses a seismic spectral demand parameter; the same importance factor can accompany different earthquake demands.
Building importance versus component importance
The building risk category describes the facility classification. Ip follows the particular component and its required function; the equipment schedule must preserve both fields.

Frequently asked questions

Does Ip = 1.5 certify a piece of equipment?

No. It is an assigned design factor. Certification establishes the specified performance over a stated demand range for the tested or otherwise qualified equipment configuration.

Sources checked

Also defined as

  • Plumbing: Component importance factor in ASCE 7, commonly 1.0 for ordinary systems and 1.5 for high-importance ones, which lowers the bracing threshold

Where this shows up