Field glossary · code or standard

MPII

MPII (manufacturer's printed installation instructions) supplies the product-specific installation method; for SET-3G at 70°F, ESR-4057 separates a 35-minute gel time from a 24-hour dry-concrete cure. Keep the instruction revision tied to each anchor location and approved evaluation report. The temperature row, moisture condition, accessories, and loading time belong in that record, because the product name alone cannot establish which evaluated installation was built.

Manufacturer's printed installation instructions, the install procedure ACI 318 Chapter 17 references

Used across 3 Anvilfield field guides, most in Concrete.
Updated

Match the instruction sheet to the approved anchor system

ACI CODE-318-25 is the current structural concrete code publication, but the approved installation package also identifies the edition used for the project. ICC-ES ESR-4057, reissued April 2026 for SET-3G, references ACI 318-19 for installation and incorporates the packaged MPII in its evaluation. Recording both documents prevents a new publication date from being mistaken for a change to an already-approved detail.

Build a document register with the instruction identifier or revision, evaluation-report issue, product designation, and anchor-schedule locations. A substitution needs a new register entry, leaving the former package attached to anchors already installed. Bring that register to the preinstallation meeting organized around the adhesive anchor guide.

What the SET-3G temperature row actually says

ICC-ES ESR-4057 lists a 35-minute gel time and a 24-hour cure time for SET-3G in dry concrete at 70°F. ICC-ES ESR-4057 requires SET-3G cure times to be doubled for water-saturated concrete. At that temperature, the saturated-concrete cure interval is therefore 48 hours, calculated from the stated 24-hour value.

ICC-ES ESR-4057 also requires conditioning the adhesive to at least 70°F when installing SET-3G in concrete below 70°F. Record the condition that selected the row beside the anchor location. A note saying cured overnight loses the temperature, moisture condition, and start time needed to verify the interval.

Keep a record of the installation method used

ESR-4057 Section 4.4 requires the manufacturer's listed accessory system, with nozzles, brushes, dispensing tools, and applicable injection accessories identified in its tables. Add the tool identifiers to the location record and photograph the setup. That record connects the approved accessory list to the equipment used on the installation.

Photograph the product label and the instruction page used for the installed condition. Link the location record to the same revision, then capture installation completion and the earliest permitted loading time. If the specified system changes during the work, retain the earlier instruction with the anchors installed under it rather than replacing every record with the newest sheet.

Distinctions

Evaluation report
Defines the evaluated system and conditions of use. The instruction sheet supplies the product-specific installation steps within that evaluated system.
Safety data sheet
Describes chemical hazards and handling information. It does not replace the drilling, cleaning, placement, and cure instructions.

Field example

SET-3G installed in water-saturated concrete held at 70°F and completed at 10 a.m. Tuesday reaches its 48-hour cure interval at 10 a.m. Thursday. The 35-minute gel value is the installation working window, not permission to torque or load the anchor on Tuesday morning.

Frequently asked questions

Is a product brochure enough to document the MPII?

File the installation sheet with its identifier or revision and the matching evaluation report. For SET-3G, compare the supplied sheet with the MPII incorporated as Figure 1 of ESR-4057; a brochure listing a 24-hour cure alone omits the temperature and moisture conditions attached to that value.

Sources checked

Also defined as

  • Datacenter: Manufacturer's printed installation instructions, which govern hole cleaning, injection, and cure
  • Manufacturer's printed installation instructions, which govern the install procedure

Where this shows up

Next step: Search public retrofit work