Field glossary · measurement
Water to cement ratio (w/c)
Water-to-cement ratio, written w/c, is mixing-water mass divided by cement mass. When fly ash, slag, silica fume, or other supplementary cementitious materials are included in the denominator, the correct term is water-to-cementitious-materials ratio, w/cm. Both are mass ratios. The batch-water setting alone is not the numerator because aggregate surface moisture and other accounted water also enter the mixture.
Mass of water over mass of cementitious material; low w/c mixes bleed less and crack plastically more easily
Choose w/c or w/cm before doing the arithmetic
ACI Education Bulletin E1-16 calculates mixing water using separately batched water plus aggregate surface moisture, and uses the combined cement and supplementary cementitious mass for w/cm. Absorbed aggregate water is distinguished from the free water entering that calculation.
A mixture contains 460 pounds of cement, 140 pounds of fly ash, and 270 pounds of mixing water per cubic yard. Its w/cm is 270 / 600 = 0.45. Its w/c, if reported using cement alone, is 270 / 460 = 0.587. The concrete has not changed; the denominator has. Label the ratio so the reviewer does not compare unlike quantities.
Keep aggregate moisture corrections on the same sheet. If 220 pounds of the mixing water came from the dispenser and 50 pounds came from surface moisture, using only the dispenser quantity would report 0.367 instead of the actual 0.45 w/cm.
Calculate the water allowance from the whole mixture
A project limits this 600-pound cementitious mixture to w/cm 0.50. The ratio ceiling corresponds to 300 pounds of mixing water per cubic yard. With 270 pounds accounted for, the ratio alone leaves 30 pounds per yard. The approved mixture's design-water quantity, available trim water, maximum slump, and delivery conditions still determine the permitted addition.
Adding 15 pounds of water per yard changes the mixture to (270 + 15) / 600 = 0.475 w/cm. Under the procedure described by NRMCA CIP 26, that measured addition goes on the delivery ticket and is followed by 30 mixing-speed revolutions. Reconcile the new numerator with the actual added amount before reporting the final ratio.
ASTM C94/C94M-26d, the current ready-mixed-concrete specification, gives precedence to the purchaser's stated requirements when they differ from its general requirements. Put the project's w/cm ceiling and authorized water-adjustment conditions on the order. A numerical allowance derived from the ratio does not override a tighter purchase requirement.
A useful range has to identify the concrete
NRMCA CIP 33 gives approximately 0.23 to 0.35 w/cm for high-strength concrete, generally requiring high-range water-reducing admixtures. That range describes high-strength mixture practice; it is not a default requirement for every slab or footing.
Attach water accounting to the slump record without inferring one value from the other. For mixtures prone to plastic cracking, retain the surface and weather observations separately; those observations do not reconstruct an unrecorded water addition.
Distinctions
- Slump
- Slump is a fresh-concrete consistency measurement. Admixtures can change slump without changing the mixing-water ratio.
- Paste content
- Paste content describes the amount of paste in the mixture. Two mixtures can have the same w/cm and different paste volumes.
Frequently asked questions
Can I calculate w/c from gallons divided by sacks?
Convert both quantities to mass and identify the actual binder mass first. A volume divided by a bag count is not the defined dimensionless mass ratio.
Does wet aggregate increase w/cm?
Its free surface water increases mixing water unless the separately added water is reduced accordingly. The absorbed portion is handled through the aggregate moisture basis.
Sources checked
Also defined as
- Mass of water divided by mass of cementitious material, the main driver of strength