ANVILFIELD Try FieldOS

Field glossary · measurement

RH (ASTM F2170)

ASTM F2170-19a reports relative humidity in a concrete test hole at the measured temperature, not the concrete's water content by mass. Wagner's checklist places the sensing depth at 40% of slab thickness for drying from the top only and 20% for drying from both faces. The hole needs at least 24 hours of equilibration; a reusable probe moved into that hole has its own equilibration requirement before recording RH.

Relative humidity inside the slab, read by in-situ probe as a percentage

Used across 2 Anvilfield field guides, most in Concrete.
Updated

Set depth and test count from the actual slab

Wagner's F2170 checklist calls for service conditioning of the slab and occupied air space for at least 48 hours. A probe map should identify slab thickness, drying faces and any areas with different exposure histories before holes are drilled.

For a 6 in. slab, Wagner's 40% depth rule gives 2.4 in. below the top surface when drying is from that face only; its 20% rule gives 1.2 in. where both faces dry. Document the drying condition used for that calculation, since choosing the wrong percentage relocates the sensing depth by 1.2 in. in this slab.

Wagner specifies three test locations for the first 1,000 sq ft and at least one additional location for each additional 1,000 sq ft. A 3,000 sq ft continuous area therefore needs at least five locations. Draw them on the placement plan rather than letting convenient access select the whole sample.

Check the sensor's history before the floor reading

Wagner's F2170 checklist calls for a NIST-traceable calibration certificate and a calibration check within 30 days before use for reusable probes. Its instructions distinguish those probes from new, unused sensors. Record the sensor serial number and the applicable verification date with the location.

The Rapid RH installation manual likewise distinguishes the reusable 5.0 system's calibration checks from the L6 system. Identify the equipment actually used rather than copying a calibration field from a different sensor system. A reader's serial number alone does not identify every sensing element that produced the slab results.

A conditioned hole does not instantly condition a moved probe

Wagner's checklist requires at least 24 hours for the test-hole moisture equilibrium period and recommends at least one hour of equilibration for a reusable probe in each test hole. For its resident Rapid RH sensors, the sensor has already equilibrated in place when the reader is connected.

A hole completes its 24-hour period at 9 a.m. A reusable probe is inserted at 9 a.m. and follows the checklist's one-hour recommendation before a 10 a.m. reading. The hole's completed waiting period does not erase the moved probe's own equilibration time.

Log the end of hole preparation, probe insertion and the stabilized reading separately. Those timestamps establish which waiting periods have elapsed. Attach that record to the slab and conditioning information in the moisture-testing guide.

Use drift to identify a reading still settling

Wagner specifies no more than 1% RH drift over a five-minute period in its F2170 checklist. Read that as a change in percentage points on the instrument display. A change from 84.0% to 84.6% is 0.6 percentage point; a change from 84.0% to 85.4% is 1.4 points.

The first pair satisfies Wagner's stability criterion; the second calls for more equilibration and another stability check. With a project product limit of 85% RH, a final stable reading of 84.6% is below the limit while 85.4% is above it. A stable reading and an acceptable moisture level are separate decisions.

ASTM F2170-19a's public explanation ties results to the particular locations and time tested. Preserve each location's stabilized result instead of describing the building with a single undated percentage.

Separate slab RH from room RH on the report

The room-condition log and the in-slab sensor both report relative humidity, but they describe different air volumes. Label their locations explicitly. An ambient reading of 45% RH and an in-slab reading of 86% RH are not duplicate measurements to reconcile by averaging.

Put room temperature and humidity in the conditioning log, then report in-slab temperature and RH together for each sensor. The flooring reviewer can then match the underlayment's substrate requirements to the hole result without confusing it with the room measurement.

Frequently asked questions

Can I read a reusable probe immediately in a hole prepared yesterday?

Follow that probe's equilibration instruction. Wagner's checklist recommends at least an hour for reusable probes in each hole, separately from the hole's 24-hour equilibrium period.

Does 86% in-slab RH mean the concrete is 86% water?

An 86% reading describes the humidity of the air at the sensor's concrete test depth and temperature. It does not assign a water-mass fraction to the surrounding slab; obtain any required mass-based result by its own specified method.

Sources checked

Where this shows up

Related guides

Next step: Search floor-replacement contracts

Back to the full field glossary