Field glossary · measurement
MVER (ASTM F1869)
The ASTM F1869-23 moisture vapor emission rate (MVER) test uses calcium chloride under a sealed cover for 60 to 72 hours in Taylor Tools' number 625 procedure, with mass recorded to 0.1 g. Its result, in lb/1,000 sq ft/24 h, comes from uptake, actual elapsed hours and kit area. Losing salt, weighing a different lid or entering 24 hours instead of the actual exposure corrupts the calculated rate.
Moisture vapor emission rate, pounds per 1000 sq ft per 24 hr by calcium chloride
Establish a bare-concrete test patch
ASTM F1869-23 excludes floors containing lightweight aggregate and gypsum concrete, as well as tests over coatings, patching or leveling compounds or through reactive penetrants. Put the slab type and existing treatments on the location plan; opening a patch through the finish does not establish that the exposed material is eligible.
Taylor's number 625 instructions call for at least a 20 by 20 in. exposed area and a minimum 24-hour exposure of that prepared area before starting the test. Keep preparation time distinct from the dish's exposure time. The underlayment guide covers the layer that follows this substrate decision.
Condition the room and budget enough test locations
Taylor's moisture-test procedure calls for service temperature and humidity for 48 hours before testing and throughout the exposure. When service conditions cannot be provided, it specifies 75 +/- 10 F and 50 +/- 10% RH. Log both conditions; conditioning the room and exposing the prepared patch are separate prerequisites.
Taylor calls for three tests in the first 1,000 sq ft and one additional test for each additional 1,000 sq ft. A 3,000 sq ft continuous test area therefore needs five dishes, distributed across representative locations and run together. Order and label all five before starting the exposure window.
Keep the dish, lid and clock together
The Taylor Tools number 625 instructions specify weighing the container with its lid and label to the nearest 0.1 g and recording times to the nearest quarter hour. Use the same identified components for the ending mass.
Taylor directs discarding the test when calcium chloride spills and limits the undisturbed exposure to 60 through 72 hours. Spilled salt subtracts mass from the measured uptake. A missing or exchanged lid also changes the weighing set; removing the lid during the exposure is part of the test, not a defect.
Enter each dish identifier, location, start mass, finish mass and elapsed duration as its own record. Preserve the environmental log and the kit instructions with that record. A laboratory calculation cannot reconstruct an unrecorded start time or an uncertain component identity.
Calculate the rate with the supplied kit's factor
Taylor publishes this calculation for number 625: MVER = mass gain in grams x 2.057 x 24 x 1,000 / (elapsed hours x 454). The output is lb/1,000 sq ft/24 h. Keep its published factor with that kit; do not transfer it to another dome design without that manufacturer's calculation basis.
A dish begins at 41.2 g and finishes at 43.8 g after 66 hours, gaining 2.6 g. The Taylor calculation is 2.6 x 2.057 x 24 x 1,000 / (66 x 454) = 4.28 lb/1,000 sq ft/24 h. Entering 24 hours instead would report 11.78, overstating the rate by 2.75 times.
Make the acceptance comparison only after calculating the rate. The MVER interpretation entry explains product limits and units; this test record establishes where the reported number came from.
Frequently asked questions
Can I remove a calcium chloride kit after 24 hours?
Taylor number 625 requires 60 to 72 hours under the sealed cover, in addition to room conditioning and prepared-patch exposure. Substituting the reporting unit's 24 hours in the calculation overstates the result.
Can I run ASTM F1869 on top of self-leveling compound?
F1869-23 excludes testing over patching or leveling compounds. Establish the required bare-concrete location before those layers are installed.
Sources checked
Also defined as
- Moisture vapor emission rate in pounds per 1000 square feet per 24 hours