Termination bar
A termination bar secures a membrane edge by clamping it to a supporting wall or curb. Inspect the bar as a compression detail: substrate contact, anchor position, end spacing, movement gaps, and the seal behind or above the sheet all matter. Factory-punched hole spacing identifies available fastening locations; the system detail determines which anchors are required.
A metal strip fastened through the membrane to hold the top of a base flashing, capped with sealant
Read the anchor schedule separately from the punched holes
Carlisle's May 18, 2026 Fastening and Termination Bars data sheet describes its aluminum termination bar as 1 inch wide by 10 feet long, with holes at 6-inch centers. Those dimensions identify the component supplied. They do not establish the anchor pattern for another manufacturer's membrane or bar.
Sika's Sikaplan Termination Bar instructions specify approved fasteners at 12-inch centers and within 1 inch of each bar end. The end condition needs its own check after a bar is cut. A layout with acceptable intermediate spacing can still leave the last few inches of membrane unclamped if the final anchor is too far from the cut end.
Confirm where each anchor actually bites. A strip spanning a recessed mortar joint can bridge the membrane instead of compressing it. Separate a stripped anchor, a bowed bar, and an uneven backing surface in the defect record; each creates a different correction to the base-flashing termination.
Leave the joint gap and cut the corners
Sika requires a 1/4-inch gap between adjoining Sikaplan termination bars and directs installers to cut the bars at inside and outside corners rather than bend them around the turn. These are movement and fit requirements, not decorative joint preferences.
A tightly butted joint can close under thermal expansion, while a bent bar can bridge a rough masonry corner and lose compression. Carlisle also directs installers to round cut-bar corners to protect the membrane from sharp edges. Before sealant conceals the joint, inspect the gap, cut edges, membrane contact, and distance from each cut end to its nearest anchor.
Find the water path before renewing the top bead
Identify whether the approved detail uses a compression seal behind the membrane, a top-edge sealant, protective counterflashing, or a combination. A top bead cannot restore compression where the membrane is loose beneath the bar. Remove failed material sufficiently to determine whether water is entering at the sealant edge, a discontinuity behind the sheet, or the wall above the termination.
Carlisle distinguishes the extruded aluminum termination bar from its Galvalume metal fastening bar in the same product sheet. Similar width and hole spacing do not make them interchangeable: the aluminum termination profile includes an edge intended to receive the system sealant. Keep the component name with the membrane system and penetration-flashing detail.
Check a cut end in this order: locate the nearest anchor, confirm its bite in the substrate, inspect membrane contact beneath the bar, and then inspect the sealant termination. If the anchor spins or the bar bridges a joint, correct that mechanical defect before replacing the top bead. Sealant renewal alone leaves the loose edge in place.
Distinctions
- Counterflashing
- A removable cover can protect the bar and sealant while the bar beneath supplies clamping force. Lifting the cover exposes the termination for inspection.
- Ballast-retaining bar
- A ballast-retaining profile contains loose surfacing at the edge. Carlisle lists it separately from the narrower flashing termination bar.
Frequently asked questions
Should every factory hole receive a fastener?
Follow the approved detail for the named bar, membrane, substrate, and anchor. Hole spacing is a component dimension; anchor spacing and end-distance requirements come from the installation detail.
Sources checked
Also defined as
- Aluminum bar that screws through the membrane to clamp a flashing to a wall, sealed at the top
- An extruded bar fastened through the membrane to clamp and hold the top of the base flashing