Cant strip
A cant strip backs the flashing where a bituminous roof turns up a wall or curb. Its profile and compatibility determine the order: Johns Manville's 1.5-by-4-inch FesCant Plus comes in bundles covering 120 linear feet, and its RS-5049 compatibility chart excludes single-ply systems. A tapered insulation edge strip, structural nailer, and wall cant perform different jobs even when their stock dimensions look similar.
A 45-degree bevel at inside corners so the plies turn up the vertical without a sharp bend
Confirm that the roof system uses this cant
Johns Manville's FesCant Plus data sheet RS-5049 marks selected BUR, APP, and SBS assemblies as compatible and says not to use the product in single-ply systems. Carry that restriction into substitutions: a catalog size and matching density do not establish compatibility with TPO, PVC, or EPDM.
Identify the transition on the roof-system detail before ordering. The cant supplies a shaped substrate for the specified flashing plies; a nailer supplies anchorage, and tapered insulation sets drainage elevations. One piece should not be credited with all three functions in the estimate.
Read the cant profile before ordering bundles
Johns Manville lists its FesCant Plus 1.5-by-4-inch profile at 30 strips and 120 linear feet per bundle. Those dimensions identify a particular catalog profile; they are not permission to substitute any triangular offcut that happens to fit the corner.
A run with 240 linear feet of that profile requires two full bundles before cuts, damaged pieces, and returns. Adding a 24-foot curb raises the net requirement to 264 feet, so the order rises to three bundles. Keep perimeter lengths and curb lengths in linear feet rather than converting them into roof squares.
Material properties do not equal allowable roof loads
Johns Manville reports nominal FesCant Plus compressive strength of 35 psi at 5 percent consolidation. That describes a material test condition, not an allowable bearing pressure for a rooftop unit or a worker's concentrated load. The shape must remain intact enough to support the flashing without creating an abrupt hollow or edge.
The same Johns Manville data sheet gives FesCant Plus a minimum density of 10 lb/ft³. Density, compressive response, and the selected profile identify the manufactured product more precisely than color or appearance. Retain the package designation when replacing damaged material so a repair does not mix unrelated strips along one wall.
Inspect the backing before the plies cover it
Look along the installed line for broken corners, open butt joints, and rocking pieces. A strip that bridges debris can leave a void beneath the flashing even when its exposed face appears straight. Close-fitting corner cuts provide support where the flashing changes direction in plan as well as in section.
Johns Manville's insulation selector distinguishes FesCant Plus from Tapered Fesco Edge Strip. The latter makes a transition at an insulation edge; selecting it by thickness alone does not reproduce the wall-cant profile. Carry the chosen material and attachment method into the built-up roofing detail before laying the flashing plies.
Distinctions
- Tapered insulation
- A roof-wide taper establishes drainage elevations. A cant supplies local backing at an angle. Drainage still follows the adjoining roof elevations.
- Wood blocking
- Blocking can provide fastener anchorage. A manufactured perlite cant supplies a shaped flashing substrate and should not be treated as structural nailer material.
Frequently asked questions
Can bundle coverage be assumed from strip size?
Use the manufacturer's linear coverage for the exact profile. FesCant Plus profiles have different strip counts and bundle coverage, so a count from another size gives the wrong takeoff.
Sources checked
Also defined as
- An angled fillet at the inside corner that lets the flashing turn up without a hard 90