Field glossary · measurement
EVT
EVT (equiviscous temperature) on a roofing-asphalt ticket identifies the application temperature for a particular viscosity and tool. NRCA uses 125 centipoise for mopping and 75 centipoise for mechanical spreading, with an application band approximately 25°F either side of the stated EVT. Measure in the cart or spreader immediately before use. That application band does not establish the kettle's maximum heating temperature, which comes from the supplier's heating instructions.
Equiviscous temperature, the asphalt temperature for proper mopping viscosity, applied within plus or minus 25°F
Why the same asphalt has two EVT targets
NRCA's current roofing glossary assigns an apparent viscosity of 125 centipoise to mop-applied roofing asphalt and 75 centipoise to mechanically spread asphalt. The mechanical target calls for a more fluid material. A work ticket that records only 'EVT 430°F' leaves out the application method needed to interpret that number.
Keep the viscosity unit attached to the target. NRCA states these recommendations in centipoise, a dynamic-viscosity unit; older documents also discuss centistokes, a kinematic-viscosity unit. Their numerical conversion depends on material density. Preserve the supplier's stated method and units when bringing a temperature into the BUR installation record.
The reading in the cart and the reading at the kettle
NRCA locates the application-temperature measurement in the mop cart or mechanical spreader immediately before use. ARMA's October 2003 article published by IIBEC describes a thermocouple or an infrared reading of an agitated surface for obtaining bulk temperature. A cooled surface skin and the bulk material can give different readings.
NRCA's May 2014 asphalt update recommends obtaining lot-specific EVT and flash-point values from the supplier. Match the temperature ticket to the production lot on the delivery record. A preprinted grade name identifies the material family; its lot-specific temperature data supplies the application targets for that shipment.
A supplier ticket specifying a mop EVT of 450°F produces a 425°F to 475°F working band under NRCA's plus-or-minus-25°F convention. A cart reading of 410°F is 15°F below its lower boundary even when the kettle log shows 475°F. Recording both locations exposes the transport loss without treating the two readings as equivalent. The supplier's maximum heating temperature still governs the kettle; adding 25°F to an EVT is not permission to exceed that limit.
Keep softening point and flash point in separate fields
ARMA distinguishes softening point, which helps describe resistance to flow at roof temperatures, from flash point, which concerns ignition of vapors under its test conditions. Neither supplies the target application viscosity. Keep separate fields for the asphalt grade, production lot, mop EVT, mechanical EVT, and supplier heating limit so one number cannot be mistaken for another.
ARMA's October 2003 discussion limits the usual BUR EVT method to unmodified hot-applied built-up roofing; modified-bitumen installation and insulation adhesion can need different application temperatures. Obtain the temperature specified for that system instead of carrying a BUR target into a different use. The modified-bitumen installation guide connects the membrane to its application method.
Frequently asked questions
Does coal-tar pitch use the asphalt viscosity target?
NRCA's glossary gives roofing coal tar an apparent-viscosity target of 25 centipoise. Identify the bitumen before reading an EVT ticket because the asphalt and coal-tar targets describe different materials.
Can overheating change the asphalt's EVT?
ARMA's IIBEC article reports that overheating can reduce asphalt's softening point and EVT. Retain the heating history with the lot record when material has experienced excessive temperature or prolonged hot storage.
Sources checked
Also defined as
- Equiviscous temperature, the bitumen temperature for the right application viscosity