ANVILFIELD Try FieldOS

Roofing

Roof ponding water: diagnosis and correction on low-slope roofs

What ponding water is, the NRCA 48-hour rule, why it kills the membrane and the warranty, slope versus deflection, and the tapered-insulation and drainage fixes that actually work.

Ponding WaterFlat RoofTapered InsulationRoof DrainageRoofing

Direct answer

Ponding water is rainwater that stays on a low-slope roof more than 48 hours after rain stops in drying weather, the criterion NRCA uses to judge drainage. It shortens membrane life, adds structural load near 5.2 lb per square foot per inch, and voids many warranties. Fix the drainage, not the symptom.

On this pagePonding water, and why a puddle two days later mattersWhat is the 48-hour rule for ponding water?What ponding actually does to the membraneThe weight, and why ponding can feed on itselfInadequate slope: the roof built flatter than it was drawnStructural deflection: the sag at midspanBlocked drains: the easiest cause, and the most commonDrains set too high, too few, or in the wrong placeWet or compressed insulationHow do you diagnose ponding water on a roof?Is a roof pond a slope problem or a structural problem?Tapered insulation: build the slope to the drainAdding, lowering, and sumping drainsStructural deflection needs an engineer, not more insulationDoes ponding water void a roof warranty?A coating over a pond is not a fixWalk it after rain, photograph it, track itLarge roofs and data centers pond differentlyWhat to documentCommon mistakesField checklistStandards and referencesUnits, terms, and conversions

Key takeaways

  • NRCA 48-hour rule: a low-slope roof should have no standing water 48 hours after rain in drying weather, or it is ponding.
  • Ponded water weighs about 5.2 lb per square foot per inch of depth, the same constant used in the ASCE 7 rain-load equation.
  • Many membrane warranties exclude ponding or require drainage within a set time, so a chronic pond can void coverage before it leaks.
  • NRCA recommends a minimum design slope of 1/4 in per ft toward drains for low-slope membrane roofs.
  • Check blocked drains first, then read pond location: at a drain means slope (tapered insulation); at midspan means structural deflection (engineer).

Ponding water, and why a puddle two days later matters

Ponding water is rainwater that sits on a low-slope roof and does not drain or evaporate within about 48 hours of the rain stopping. A wet roof right after a storm is normal. A roof with the same puddles two days later, in weather that should have dried them, has a drainage or a deflection problem, and the puddle is the symptom, not the disease.

NRCA judges proper drainage by that 48-hour mark, and most membrane manufacturers write their warranties around the same idea. Short-term water is unavoidable on a flat roof. Water that stays is what does the damage. It shortens membrane life, grows algae and collects dirt, adds weight the deck has to carry, and points to whatever is keeping the roof from shedding water.

Two companion guides carry the pieces this one leans on. Sizing the drains, leaders, scuppers, and the required overflow is its own subject, covered in the roof drainage guide. Catching ponds early and keeping the warranty maintenance current belongs to the inspection and maintenance program. This guide is about the pond itself: why it matters, what causes it, how to tell a slope problem from a structural one, and how to fix it for good instead of painting over it.

What is the 48-hour rule for ponding water?

The 48-hour rule is the field test for whether a low-slope roof drains. NRCA's long-standing criterion is that there should be no ponding water 48 hours after a rain, during conditions conducive to drying. Water gone inside that window counts as adequate drainage. Water still standing past it counts as ponding, and as a defect to correct.

Two qualifiers matter and people drop them. First, the clock runs during drying weather. A 48-hour stretch of fog, high humidity, or another rain does not count, because you are measuring drainage, not evaporation. Second, the rule is NRCA guidance and the basis for most manufacturer warranty language, not a plumbing-code mandate. The membrane manufacturer's published warranty terms are what actually decide whether a given pond voids your coverage, so read those for the project.

The reason the trade settled on 48 hours is that it separates a slow-draining roof from a roof that cannot drain at all. Anything that dries inside two days is shedding water, just slowly. Anything that does not is holding water against the membrane for the life of the roof, every time it rains.

What ponding actually does to the membrane

A pond is not just water. It is accelerated aging concentrated in the low spots. The membrane under standing water ages faster than the membrane in the field, and you can read it: the ponded area discolors, the surface chalks or crazes, and seams inside the pond are the first to open.

Standing water drives several failures at once. It collects dirt and grows algae and biological growth, which holds more water and traps more dirt, so the pond gets dirtier and dries slower over time. On many membranes, constant wetting plus UV breaks down the surface and stresses the seams and laps, which is where leaks start. Freeze-thaw in the pond works seams and flashings loose. And once water finds a seam or a flashing weakened by all of this, the leak is directly over the worst part of the roof, with a head of water sitting on it to drive the leak harder than a sloped area ever would.

The other costs are slower but real. Mineral deposits and staining left when a pond finally dries mark the chronic low spots. Many manufacturers exclude ponding from warranty coverage outright, so a pond you ignore can cost you the warranty before it costs you the roof.

The weight, and why ponding can feed on itself

Water is heavy, and a roof in a low spot carries every inch of it. A one-inch layer of water weighs about 5.2 lb per square foot, which is the density of water, 62.4 lb per cubic foot, spread one inch deep. That same 5.2 figure is the constant in the ASCE 7 rain-load equation for the same reason. Three inches of ponded water is over 15 lb per square foot of dead load the structure never sees on a clear day.

The dangerous part is not the static weight. It is the feedback. Water collects in a low spot, the added weight deflects the deck and framing a little more, the deeper low spot collects more water, and that water deflects the structure further. Engineers call it ponding instability or progressive deflection, and on a flexible roof it can run away. Most ponds never get there. But on a long-span, lightly-framed, or already-deflected roof, an extreme rain on top of a blocked primary drain is exactly the scenario behind low-slope roof collapses.

This is why the structural side is not yours to eyeball. ASCE 7 and FM Global's roof-loads guidance, DS 1-54, both require checking that a roof will not become unstable from ponding. If a roof is deflecting under water, that is an engineer's call, not a roofer's.

Inadequate slope: the roof built flatter than it was drawn

The most common reason a roof ponds is that it was built flatter than it was drawn. NRCA recommends a minimum design slope of 1/4 in per ft toward the drains for low-slope membrane roofs. A true dead-flat roof, or one drawn at 1/4 in per ft and built closer to level, has no reliable path to push water to the drain, so water sits wherever the deck is lowest.

Low-slope is not no-slope, and that distinction gets lost in the field. Decks built to nominal zero slope, or slope that gets eaten up by deck camber, construction tolerance, and settled framing, leave broad flat areas that hold a thin sheet of water across half the roof. The water is not deep, but it covers a lot of membrane and never fully clears.

A roof that ponds because it was built flat will not fix itself, and adding drains to a flat roof does little, because water cannot reach the new drain any better than the old one. The correction is to build slope into the assembly, which is the tapered-insulation fix later in this guide.

Structural deflection: the sag at midspan

The second structural cause is deflection. The deck and framing sag between supports, so a roof that started with slope develops low spots at midspan even though the drains sit at the right elevation. Steel joists and bar joists deflect under sustained load. Wood framing creeps over years. The result is a sag that holds water in the middle of a bay, away from the perimeter and away from the drains.

You can tell a deflection pond from a slope pond by where it sits. A deflection pond forms at midspan or midbay, at the low point of the sag, not at a drain. It often lines up with the structural grid, centered between columns or beams. And it can appear on a roof that drained fine for years, because the sag developed over time, sometimes worsened by the very water the sag is now holding.

Adding insulation over a deflection pond is a trap. Pile tapered insulation on a sagging deck and you have added dead load to a structure that is already deflecting, which can make the sag worse. A deflection pond is a structural question first. The fix starts with an engineer, not a roofer.

Blocked drains: the easiest cause, and the most common

The easiest cause to find, and the most common one you can actually clear in an afternoon, is a blocked drain. Leaves, gravel, roofing debris, a windblown trash bag, or an iced-over strainer dome will dam a drain that was sized and sloped correctly, and the roof ponds around a drain that works fine the moment you clear it.

Check this first, every time, before you reach for any theory about slope or deflection. Pull the strainer dome and look down the drain. Check the scupper throats and the gutter behind a parapet. A pond that drains within minutes of clearing a strainer was never a roof defect. It was housekeeping.

Blocked drains are also where ponding meets the drainage design. If a roof clogs constantly, the strainers may be wrong, the drains too few, or the secondary overflow missing, which is the drain-sizing subject covered in the roof drainage guide. But the recurring fix on a well-designed roof is simple and unglamorous: keep the drains and scuppers clear, and walk them after every storm and every leaf drop.

Drains set too high, too few, or in the wrong place

A drain only works at its rim elevation, so a drain set above the low point of the roof guarantees a pond. If the deck dishes below the drain, or the drain was installed proud of the membrane instead of sumped into it, water stands up to the rim before any of it leaves. You see this where a drain sits on top of insulation that was never recessed, with a ring of permanent water around a bone-dry strainer.

Too few drains, or drains in the wrong place, do the same thing more broadly. A drain at a high corner of a bay does nothing for the low corner. Long distances between drains leave the midpoints with nowhere close to go. The drainage design sets how many drains and where, and a roof short on drains, or with them at the wrong elevations, ponds no matter how clean the strainers are.

The fix is to bring the drainage to the water. Sump the drain so its rim is the true low point, add drains where the spacing is too wide, and slope the membrane to them. Lowering or re-sumping an existing drain is often cheaper than it sounds and solves the pond directly.

Wet or compressed insulation

Wet or compressed insulation makes its own low spots. Once water gets into the insulation, through a seam, a fastener, or a flashing, the wet board loses thickness and rigidity, sags, and holds water above it, which drives more water in. The pond and the wet insulation feed each other.

Foot traffic and equipment do the same thing locally. Insulation compressed under a heavily-walked path, under a rooftop unit, or under stored material settles into a low track that ponds. On older roofs, the original insulation can shrink or degrade unevenly and leave a rolling surface that holds water in dozens of shallow spots.

The tell is that the low spot is soft underfoot. Wet or crushed insulation gives when you step on it, and an infrared scan or a core cut confirms the moisture. You do not fix this by skinning over it. The wet board has to come out, because water trapped in the assembly keeps degrading the deck and the insulation around it, and any new slope you build over saturated board is building on a sponge.

How do you diagnose ponding water on a roof?

Diagnose a pond by documenting it after the 48-hour mark, not while the roof is still draining. Go up about two days after a rain, in drying weather, and find every spot still holding water. The ponds that survive that window are the ones worth correcting.

Mark and measure each one. Outline the pond edge with chalk or marking paint, or photograph it against fixed references like a curb, a drain, or a panel line so the same pond is recognizable next time. Measure the depth at the deepest point with a ruler or a depth gauge. Even 1/4 to 1/2 in over a wide area is meaningful. Note where the pond sits relative to the drains and the structural grid.

Then check the drains before anything else. Clear the strainer and watch whether the pond moves. If it drains, you found it. If it does not, the question becomes slope versus deflection, which the next section sorts out. Documenting the pond this way also feeds the inspection record, so you can tell next year whether a pond is stable or growing, which is the maintenance-program subject in the companion guide.

Is a roof pond a slope problem or a structural problem?

Once the drains are clear and the pond still stands, the one question that decides the fix is whether the pond is a slope problem or a deflection problem. They look identical as puddles and call for completely different work, so sort them before you spend money.

Read the location. A pond at or near a drain, or along a low edge with the drains uphill, is usually a slope problem: the membrane is not pitched to carry water to the drain. A pond out in the middle of a bay, centered between columns or beams and nowhere near a drain, is usually a deflection problem: the structure is sagging and the water is sitting in the sag. A roof that drained for years and recently started ponding at midspan is deflection until an engineer says otherwise.

When you are not sure, get a survey. A simple level or laser survey of the deck shows whether the low spots follow the design slope or follow the framing. Slope problems get tapered insulation and crickets. Deflection problems get an engineer. Treat a deflection pond as a slope problem and you will load a sagging deck with insulation and make it worse.

Tapered insulation: build the slope to the drain

The permanent fix for a slope-caused pond is to build slope into the roof with tapered insulation, pitched to carry water to the drains. Tapered polyiso or other tapered board is manufactured in slopes such as 1/8, 1/4, and 1/2 in per ft, and a designer lays out a system that takes the high points down to the drains and scuppers at a positive slope, commonly 1/4 in per ft to match the NRCA design minimum, sometimes more where the layout is tight.

This is the fix that actually solves the problem, because it changes the shape of the roof instead of just sealing the puddle. On a re-cover or a tear-off it is the standard answer. On an existing roof you can sometimes add a tapered layer in the ponded areas alone, though tying new slope into the existing field without creating new dams takes a real layout, not a guess.

Two cautions. Tapered insulation adds dead load, so on a marginal or deflecting structure it is the wrong tool, and you are back to the structural fix. And the layout has to crown between drains so water is always pushed toward a drain, never trapped in a new flat valley. A bad tapered layout just relocates the pond. Crickets and saddles, the raised diverters built between drains and behind wide curbs, are part of the same layout, steering water around the obstruction and down to the drain instead of letting it dam up behind a curb.

Adding, lowering, and sumping drains

When the drainage, not the slope, is short, the fix is at the drains. Sump an existing drain so its rim becomes the true low point and water actually reaches it. Lower a drain that sits above the deck. Add drains where the spacing leaves midpoints stranded, then slope the membrane to the new locations. On a roof that clogs and backs up, confirm the secondary overflow drainage is present and set correctly, because a missing overflow turns a blocked primary into a deep, dangerous pond.

Sizing and placing primary drains, overflow drains, and scuppers is the drain-sizing subject, covered in the roof drainage guide. Coordinate any added or relocated drainage with that and with the adopted plumbing code. The required secondary overflow, set above the low point so it takes over when the primary blocks, is part of every low-slope drainage design, not an extra.

The point here is that adding a drain to a flat or sagging roof does little on its own. Water still cannot reach it. Drains fix ponds only when the membrane is sloped to deliver water to them, which is why the drain work and the tapered work usually go together.

Structural deflection needs an engineer, not more insulation

A deflection pond is a structural problem, and the fix belongs to a structural engineer, not to more insulation. If the deck and framing are sagging under load, the questions are whether the structure is overloaded, whether it is deflecting beyond its design, and whether it is at risk of ponding instability, and those are engineering calls. The remedy might be reinforcing or adding framing, not anything a roofing crew does.

The wrong move, and a common one, is to bury a deflection pond under tapered insulation to chase the water uphill. That adds dead load to a structure that is already deflecting, which can deepen the sag and, on a marginal roof, push it toward the runaway condition. Build slope over a sag only after an engineer has confirmed the structure can carry it.

Get the engineer involved early when a pond sits at midspan, when a roof that used to drain has started ponding, or when you see visible sag, cracked decking, or distressed framing from below. ASCE 7 and FM Global's DS 1-54 both treat ponding and the instability it can cause as a structural design item. On the structural side, hedge to the engineer, every time.

Does ponding water void a roof warranty?

Ponding water voids or excludes coverage under many membrane warranties, which is why a pond you ignore can cost you the warranty long before it costs you a leak. Manufacturers know standing water ages the membrane faster, so a large share of single-ply and other membrane warranties either exclude ponding outright or require that the roof drain within a set period, often tied to the same 48-hour idea NRCA uses.

The terms vary by manufacturer and product, so read the actual warranty for the roof in question rather than assuming. Some exclude ponding entirely. Some require positive drainage as a condition of coverage. Some allow short-term water but not chronic ponds. The common thread is that a documented, persistent pond gives the manufacturer a clean reason to deny a claim in the ponded area.

The practical move is to find and correct ponds while the roof is young and the warranty is in force, and to keep the inspection and maintenance records that show you did, which is the maintenance-program subject in the companion guide. A pond left to sit is the manufacturer's defense, handed to them in writing.

A coating over a pond is not a fix

A coating over a pond does not fix the pond. Rolling a reflective or waterproof coating across a ponded area changes the color, not the slope, so the water still stands, still adds load, and still works the seams underneath. Worse, some coatings are not rated for continuous water immersion and break down faster sitting in a pond than they would in the field, so you can spend the money and shorten the coating's life at the same time.

Coatings have a real place. A coating rated for ponding water can buy time on a sound but ponding roof, and coatings restore and reflect on roofs that already drain. What a coating cannot do is create slope or move water to a drain. If the roof does not drain, fix the drainage first: clear or add drains, build slope with tapered insulation, or address the structure. Then coat, if a coating is in the plan.

The order is the whole point. Drainage first, coating second. Reverse it and you have painted a problem you still own.

Walk it after rain, photograph it, track it

Ponds are caught by walking the roof after rain, not by waiting for a leak. The discipline is simple. About 48 hours after a storm, in drying weather, walk the roof, find the water still standing, and record it. Photograph each pond against fixed references, mark and measure the depth, and log the date and weather so the next walk compares against the last.

Tracking is what turns a pond from a snapshot into a trend. A pond that is the same size and depth every year is stable and may just need its drain kept clear. A pond that is growing, deepening, or appearing in new midspan locations is telling you the structure is moving, and that moves it from maintenance to engineering. You cannot see that change without dated records.

This monitoring rides on the regular roof inspection cadence and the roof file, which is the inspection and maintenance program in the companion guide. Capture the pond photos, depths, and locations the same way you capture the rest of the inspection, in one record that travels with the roof. A field tool like FieldOS keeps the dated, located, before-and-after photos in one place so a pond's history is one tap away instead of scattered across phones. To add properties to that inspection route, PorchRocket's Ground Control delivers commercial building lists within 48 hours, while ponding history stays part of the on-site survey.

Large roofs and data centers pond differently

Big roofs pond differently. On a large warehouse, distribution center, or data center roof, the spans are long, the framing is often optimized close to its limits, and a single roof can cover acres, so a small slope error or a little deflection puts an enormous area of membrane under standing water. The drainage runs are long, the drains are far apart, and a blocked drain backs up a much larger tributary area before the overflow takes over.

The structural stakes scale with the size. Long-span, lightly-framed roofs are exactly the ones where ponding instability is a live concern, so the rain-load and ponding check under ASCE 7 and FM Global's DS 1-54 carries more weight on a large building than on a small one. On these roofs the drainage design, the structural check, and the ponding correction have to be coordinated as one problem, and the engineer is in the room from the start.

What to document

Write down each pond so a pattern shows up over time and the fix is matched to the cause. The record that pays off is the one that ties a pond's location and depth to what is actually causing it, because that is what tells you whether to call a roofer, a plumber, or an engineer.

Capture the location, the depth at the 48-hour mark, the date and weather, whether clearing the drain moved it, and where it sits relative to the drains and the structural grid. The table below pairs the common causes with the tell that identifies each and the fix that matches.

CauseTellFix
Blocked drain or strainerPond around a clean drain; clears when the strainer is pulledClear and keep drains and scuppers clear; walk after storms
Inadequate slope (built flat)Broad thin pond, drains at the correct elevationTapered insulation to 1/4 in per ft, crickets to the drains
Drain too high or too fewRing of water around a drain proud of the deckSump or lower the drain; add drains; slope to them
Structural deflectionPond at midspan, between columns, growing over timeStructural engineer; reinforce, do not just add insulation
Wet or compressed insulationSoft low spot underfoot, confirmed wet by scan or coreRemove the wet board, rebuild slope on sound insulation
Missing or high overflowDeep pond when the primary backs upAdd or correct the secondary overflow per the drainage design

Common mistakes

  • Ignoring a pond until the membrane fails or the warranty is voided.
  • Skipping the blocked-drain check and theorizing about slope first.
  • Coating over a pond instead of fixing the slope or the drainage.
  • Treating a structural deflection pond as a simple slope fix and adding insulation to a sagging deck.
  • Leaving out secondary or overflow drainage, so a blocked primary backs up into a deep pond.
  • Not marking and measuring the pond, so you cannot tell a stable pond from a growing one.

Field checklist

0 of 10 complete

Want this checklist to run itself on every job — with photo proof and a signed record crews can hand the customer? That's FieldOS.

Standards and references

NRCA, the National Roofing Contractors Association, is the source of the 48-hour drainage criterion and the recommended minimum design slope of 1/4 in per ft toward drainage for low-slope membrane roofs. Treat both as industry guidance, the accepted standard of care, rather than as code text, and follow the membrane manufacturer's published warranty terms for what ponding does to coverage on a specific roof.

The structural side runs through ASCE 7, the standard for minimum design loads, which sets the rain load and requires that roofs be checked so ponding does not cause instability. FM Global's DS 1-54, Roof Loads for New Construction, covers the same ground for FM-insured buildings and ties primary and secondary drainage to the load the roof can carry. The constant 5.2 lb per square foot per inch of water comes straight from the density of water and shows up in the ASCE 7 rain-load equation.

Secondary, or overflow, drainage is required by the plumbing and building codes. The International Plumbing Code and International Building Code, as adopted and amended by the jurisdiction, set the rules for primary and overflow roof drainage; the drain-sizing details are in the roof drainage companion guide. The membrane manufacturer controls the warranty, and a structural engineer controls any call about deflection or ponding instability. Verify the adopted code edition, the standard's current version, and the manufacturer's terms before you rely on any of them on a submittal.

Units, terms, and conversions

Ponding goes by a few names and gets measured a few ways, so the same condition can read differently across a report, a spec, and a warranty.

Ponding water is also called standing water, pooling, or birdbaths for the small isolated spots. Slope is written as a ratio or a rise per run: 1/4 in per ft is the same as a 1:48 slope, or roughly 2 percent. Ponded water weighs about 5.2 lb per square foot per inch of depth. Depth is read in inches or fractions of an inch, and even 1/4 to 1/2 in over a wide area carries real weight and ages the membrane.

Ponding water
Water standing on a low-slope roof more than 48 hours after rain in drying weather, per NRCA
Positive drainage
A roof sloped so all water reaches the drains or scuppers within about 48 hours
Design slope
The pitch built into the roof toward drainage, commonly 1/4 in per ft minimum for membrane roofs
Tapered insulation
Insulation board manufactured at a slope to build drainage into a flat or ponding roof
Cricket / saddle
A raised, sloped diverter that pushes water around a curb or between drains toward a drain
Ponding instability
Progressive deflection where ponded water sags the deck, which collects more water and more sag
Overflow drainage
The secondary drains or scuppers that carry water when the primary system is blocked

Related tools

Field notes

Next step: Build a drainage repair territory

FAQ

What is ponding water on a roof?

Ponding water is rainwater that collects and stays in the low spots of a low-slope roof where it does not drain. The field test is the 48-hour rule: water still standing two days after rain, in drying weather, is ponding, and it signals a slope, drain, or structural problem to correct.

What is the 48 hour rule for ponding?

The 48-hour rule, from NRCA, says a low-slope roof should have no standing water 48 hours after rain during drying weather. Water gone in that window is adequate drainage; water still there is ponding and a defect. It is industry guidance and the basis of most warranty language, not a code mandate.

Is ponding water on a flat roof a problem?

Yes. Ponding shortens membrane life, grows algae and collects dirt, adds about 5.2 lb per square foot per inch of dead load, can void the warranty, and points to a drainage or structural fault. Short-term water after rain is normal; water still standing past 48 hours is the problem to fix.

How do you fix ponding water on a roof?

Fix ponding by correcting the cause, not the puddle. Clear or add drains and sump them to the low point, build slope with tapered insulation and crickets to about 1/4 in per ft toward the drains, and for a midspan deflection pond bring in a structural engineer. Coating alone does not fix it.

How deep does ponding water have to be to cause damage?

There is no safe depth. Even 1/4 to 1/2 in over a wide area ages the membrane, grows algae, and adds weight at about 5.2 lb per square foot per inch. The 48-hour duration matters more than the depth: shallow water that never drains still damages the membrane and can void coverage.

Does ponding water void a roof warranty?

Often, yes. Many single-ply and membrane warranties exclude ponding or require the roof to drain within a set time, frequently tied to the 48-hour idea. Terms vary by manufacturer and product, so read the actual warranty. A documented, chronic pond gives the manufacturer a clean reason to deny a claim.

Is a roof pond a slope problem or a structural problem?

Read where it sits. A pond at or near a drain, with the drains uphill, is usually a slope problem fixed with tapered insulation. A pond at midspan, centered between columns and away from drains, is usually structural deflection and needs an engineer. Survey the deck when you are unsure.

Will a roof coating stop ponding water?

No. A coating changes the color, not the slope, so the water still stands and still ages the membrane underneath, and some coatings are not rated for constant immersion and fail faster in a pond. Fix the drainage or slope first, then coat with a ponding-rated product if a coating is planned.

What causes ponding water on a flat roof?

The common causes are inadequate slope, a roof built flatter than the 1/4 in per ft design, blocked or too-few drains, drains set above the low point, structural deflection at midspan, and wet or compressed insulation. Blocked drains are the easiest to find and clear, so check the strainers first.

People also ask

Codes cited in this guide

This guide is written and reviewed against the published standards below. Always confirm the current adopted edition with the authority having jurisdiction.