American Society of Civil Engineers, Structural Engineering Institute
ASCE 7-22: tornado screening, hazard reports, and design handoffs
ASCE/SEI 7-22 establishes minimum structural loads and their combinations for buildings and other structures. Its 2022 revision adds tornado provisions and revises several environmental hazards; later supplements also change the design reference. A useful project handoff preserves the selected edition, supplement basis, site data, risk category, and calculation outputs together. A hazard-map value supplies an input to design, rather than a roof attachment schedule or equipment anchorage approval.
Applies to
Structural engineers, architects, delegated designers, building officials, and contractors use ASCE 7 through adopted building-code and project requirements. ASCE identifies incorporation by reference into the IBC, IEBC, IRC, and NFPA 5000.
A trade submittal needs the designer's applicable load cases and pressures as well as the site hazard report. Carry those outputs into the roof attachment schedule or equipment calculation with their edition and supplement basis intact.
Key topics
Save a hazard report with its inputs and chosen edition
ASCE's Hazard Tool supplies location-based data for eight environmental hazards: wind, tornado, seismic, ice, rain, flood, snow, and tsunami. Its downloadable PDF report preserves the selected data for the design record. Keep the report's location, edition, risk category, and applicable site inputs with the calculations. A saved screenshot of one number omits the context needed to reproduce the designer's selection.
When does Chapter 32 require tornado design?
FEMA and NIST's ASCE 7-22 design guide screens Risk Category III and IV structures in the mapped tornado-prone region. Mandatory tornado design requires a design tornado speed of at least 60 mph and at least 0.50, 0.60, or 0.67 times the basic wind speed for Exposure B, C, or D, respectively. Owners can also specify tornado design beyond these minimum triggers. Record the category, region, speeds, and exposure; geographic location alone does not complete the screening.
Effective plan area can include essential support buildings
FEMA and NIST explain that an essential facility's tornado effective plan area encloses the facility and the structures needed to keep it functional. The hospital and its separate central utility plant therefore need a combined enclosing polygon. Measuring only the hospital roof omits part of the hazard input even when the buildings are structurally independent.
The tornado chapter does not establish a storm shelter
ASCE's tornado-chapter explanation states that its design criteria generally address approximately EF2 intensity or less, depending on location and other factors. ASCE 7-22 tornado design does not establish ICC 500 storm-shelter performance. Keep the shelter requirement, ordinary building design, and equipment-support scope identifiable in the owner's program. A building's tornado design basis is not permission to describe an occupied room as a rated shelter.
A supplement changes provisions; an erratum corrects publication
ASCE distinguishes balloted supplements that extend standard provisions from errata that correct discrepancies or typographical errors. Its current 7-22 resource page links Supplements 1, 2, and 3 plus errata. Identify which amendments the project applies and retain the actual documents. ASCE's 2023 flood-update announcement, for example, describes a shift to 500-year floodplain data for Risk Category II structures, showing why the book's base edition alone is an incomplete design record.
How it is used in the field
Before comparing delegated submittals, align their hazard basis. A roof assembly package, rooftop solar support design, and equipment anchorage calculation can use different parts of ASCE 7 while still needing one coordinated site and code basis. Differences in edition, supplements, location, or risk category should be resolved before comparing demand and capacity.
For a rooftop array, give the delegated designer the accepted hazard report and building geometry, then retain the resulting support and attachment design. The rooftop PV guide addresses the installation interface. Record later changes in array footprint or support arrangement so the design basis remains tied to what was built.
For a Risk Category III building in the tornado-prone region with Exposure C and a basic wind speed of 120 mph, the tornado screening ratio gives 0.60 x 120 = 72 mph. A design tornado speed of 70 mph clears the 60-mph screen but falls below 72 mph, so the mandatory screen does not trigger. That result documents applicability; it does not specify an attachment pattern.
In a multi-trade review, keep the load calculation separate from the product qualification or test report it is compared with. The prefab seismic certification guide explains why equipment test evidence must be matched to the project demand and installation conditions. Neither report should be reduced to a generic seismic-rated label at turnover.
Edition history
The 7-22 edition follows 7-16 and remains the edition identified on ASCE's current standard page as of November 5, 2026. The publisher's separate supplements and errata are part of the document-control task. Archive the accepted set with the project rather than relying on a future website view to recreate it.
Adoption
ASCE 7 reaches construction through the adopted building code, its referenced edition and amendments, and project requirements. ASCE's introduction names the IBC, IEBC, IRC, and NFPA 5000 as reference pathways. A code adoption and a contract's supplement selection must be recorded explicitly; publication of a supplement does not identify the permit's accepted basis.
Frequently asked questions
Does an ASCE Hazard Tool report complete the structural design?
The report supplies selected hazard data. The designer still applies the relevant geometry, exposure, structural system, component conditions, and load combinations to produce the project's demand and details.
Does ASCE 7-22 tornado design make a building a storm shelter?
ASCE explicitly distinguishes its tornado criteria from safe-room and storm-shelter performance. ICC 500 addresses storm shelters; retain that scope as a separate owner and design requirement.
Why save supplements instead of just the standard's cover?
ASCE defines supplements as extensions of the provisions approved through committee balloting. A cover identifies the base edition, while the accepted supplement set identifies the additional provisions used in the calculations.
Sources checked
- ASCE: current 7-22 standard and official supplement links
- ASCE introduction to 7-22: new hazards, code references, and Hazard Tool reports
- ASCE Hazard Tool: eight environmental hazards and location-specific design inputs
- ASCE: tornado chapter, plan-size effects, and distinction from storm shelters
- ASCE: May 25, 2023 flood-load supplement announcement
- ASCE SEI: meanings of supplements, errata, and interpretations
- FEMA/NIST 2023 design guide: Chapter 32 screening and effective plan area, pages 5-9