Field glossary · process
Changeover
A two-pipe terminal can call for cooling while its changeover sensor still sees water too warm to enable the cooling valve. On Resideo's TB6575/TB8575 controls, the default cooling and heating thresholds are 60°F and 80°F. Water between them invokes the configured system type's intermediate-temperature behavior. Diagnose that behavior from the pipe reading, purge setting and auxiliary-heat configuration together, rather than from the room setpoint alone.
A two-pipe arrangement that switches the whole zone between chilled and heating water seasonally; four-pipe avoids it
Which temperature selects heating or cooling?
Resideo's legacy TB6575/TB8575 instructions, revision 62-0311-13, use default pipe thresholds of 60°F for cooling and 80°F for heating. Cooling becomes available below its threshold and heating above its threshold. The manual identifies the product as no longer manufactured; these settings remain relevant when servicing that installed thermostat family.
The same Resideo instructions allow a cooling threshold from 50 to 72°F and a heating threshold from 75 to 90°F. Record both configured values and the sensor reading. A control drawing that says only automatic changeover leaves the technician without the actual decision boundaries used by the terminal.
Why a closed valve can hide the new water temperature
Resideo uses five-minute purges to bring current loop water to an isolated branch sensor. Installer setting 25 offers no periodic purge, a two-hour interval by default, or a 24-hour interval. Disabling periodic purging leaves the other purge triggers active. During the initial purge after installer setup, the valve energizes and the fan stays off.
Johnson Controls' fan-coil piping catalog requires a quarter-inch bleed line for its two-pipe changeover packages using a two-way valve and factory thermostat. The catalog makes that bleed optional with field-provided thermostats. The sensing arrangement explains the difference: a continuously wetted aquastat and a controller that periodically purges a closed branch use different ways to obtain a representative water temperature.
Recognize an intermediate-temperature lockout
Resideo distinguishes two-pipe auto changeover from two-pipe operation with auxiliary heat. If water remains between the thresholds after two five-minute purges, both sequences disable the water-valve output, but their available heating differs.
Read the installer system-type selection before interpreting the valve state. Add that selection and the pipe temperature to the fan-coil valve checkout. Two terminals with the same disabled water valve can have different available heat outputs, as the configuration table shows.
| Resideo system type | Between thresholds after the second purge |
|---|---|
| Two pipes with auto changeover | Fan-only mode; manual fan operation remains available |
| Two pipes with auxiliary heat | Water valve disabled; auxiliary heat remains available for heating calls |
Distinctions
- Economizer changeover
- An economizer changes cooling source according to outdoor conditions. It does not establish whether a two-pipe terminal has heating or chilled water available.
Field example
A TB6575/TB8575 sensor reads 70°F after both five-minute purges, with thresholds still set to 60°F and 80°F. In two-pipe auto mode, the result is fan-only operation. In the auxiliary-heat configuration, the same water reading leaves electric heat available on a heating call. The water temperature alone does not distinguish those outcomes.
Frequently asked questions
Does four-pipe equipment eliminate every use of changeover?
It eliminates the shared water circuit's seasonal conversion. A four-pipe thermostat still chooses between available heating and cooling outputs, using its configured deadband and sequence.
Sources checked
Also defined as
- The wet-bulb-based control point at which the plant enables or drops free cooling, with an offset and deadband
- Switching the system between heating and cooling when zones call for opposite modes