Integrated economizer

An integrated economizer continues useful economizer cooling while mechanical refrigeration supplies the remaining load. Its identifying feature is the operating sequence under partial free-cooling conditions, rather than the presence of an outdoor-air damper or heat exchanger. Acceptance should demonstrate that the two cooling sources share the load without one being disabled prematurely or the system adding an artificial load to keep refrigeration operating.

An economizer that runs at the same time as mechanical cooling so partial free cooling is not wasted

Used across 3 Anvilfield field guides, most in HVAC.
Updated

Prove the partial-load operating region

California's 2025 Energy Code, Section 140.4(e)2B, requires air economizers installed to satisfy its economizer requirement to provide partial cooling when mechanical cooling must meet the remaining load. This addresses the operating region between full economizer cooling and full mechanical cooling. A test demonstrating only those two endpoints misses integration.

During the air-side economizer functional test, trend outdoor-air, return-air, mixed-air, and supply-air temperatures with damper command and mechanical-cooling stages. Examine the mixed-air result immediately before and after a compressor starts. A command showing an open damper does not establish useful precooling if measured mixed air shows no corresponding contribution.

Read a waterside temperature profile as a load split

For a series waterside arrangement with the same water flow through both devices, suppose return water enters the economizer at 58°F, leaves it at 50°F, and leaves the chiller at 44°F. The economizer supplies 8 of the total 14 degrees of cooling, or about 57% of the water-side sensible load; the chiller supplies the remaining 43%. This split assumes steady flow and essentially unchanged water heat capacity.

ASHRAE's 2023 HVAC Applications chapter on controls describes typical waterside economizer operation using tower water at 45°F or below to produce chilled water at 50°F or below. Those temperatures explain why a useful economizer contribution can exist even when the final chilled-water requirement still needs refrigeration. Actual enable conditions depend on the tower, heat-exchanger approach, and plant temperatures.

Check minimum-load behavior during the transition

For DX units covered by Section 140.4(e)2Fiii, California's 2025 Energy Code prohibits false loading by limiting or disabling economizer operation, except at the lowest mechanical-cooling stage. Review the applicable minimum-load sequence instead of using simultaneous operation alone as proof of good integration.

A waterside heat exchanger needs enough available temperature difference to transfer useful heat. An enabled pump and open valve do not establish that transfer. Compare entering and leaving temperatures with flow status, then verify the chiller's required operating conditions during entry to and exit from economizer operation.

Distinctions

Nonintegrated economizer
An exclusive either/or cooling sequence shows no operating interval with both an economizer contribution and mechanical cooling serving the same demand.

Frequently asked questions

Does integration always mean air-side economizing?

No. Air-side systems combine outdoor-air cooling with refrigeration; waterside systems can precool the returning water before refrigeration completes the cooling. The shared-load behavior is the defining feature.

Sources checked

Also defined as

  • Datacenter: Economizer and chiller running at the same time, capturing the partial-cooling hours
  • Free cooling and the chiller running together, the economizer pre-cooling so the chiller does less