in. wg / in. w.c.
In. wg is inches of water gauge, also written in. w.c.; NIST assigns 249.0889 Pa to one conventional inch. When transferring readings between a manometer and BAS, preserve the unit convention, pressure reference, sign, and transmitter range. A controller scaled for 0 to 5 in. wg will misread a 0 to 2 in. wg transmitter even though both screens show the same unit.
Inches of water column; conventional pressure conversion from NIST
Why published conversion factors differ slightly
NIST Special Publication 811 lists one conventional inch of water as 249.0889 Pa. The same NIST table lists an inch of water at 4°C as 249.082 Pa and at 60°F as 248.84 Pa. These are defined conversion choices, not three different abbreviations.
The conventional and 60°F factors differ by about 0.10%. Preserve a manufacturer's stated convention when checking a laboratory calibration or an instrument certificate. For ordinary duct work, a large disagreement between two readings is unlikely to be explained by this small conversion difference; inspect the pressure pickup, range, zero, and measurement boundary first.
A transmitter range error is much larger than rounding
A transmitter configured for 0 to 2 in. wg over a 4 to 20 mA signal reports 1 in. wg at 12 mA. If the controller incorrectly scales that same input as 0 to 5 in. wg, its display reads 2.5 in. wg. Both screens can carry the correct unit name while disagreeing by a factor of 2.5.
Document the lower and upper engineering values at both ends of the signal path. For a bidirectional transmitter, include the negative end of the range. A 12 mA midpoint on a -1 to +1 in. wg range means zero differential pressure, not 1 in. wg. Confirm the range on the actual configured device, rather than relying solely on its ordering description.
Keep a useful number of digits in the report
NIST's pressure-conversion table gives one conventional inch of water as 0.0361273 psi. A BAS calculation using psi internally therefore needs a different scale factor from one using pascals. Label intermediate values in exported calculations so a later reviewer can identify the conversion path.
A reading of 0.42 in. wg converts to about 104.6 Pa using the conventional factor. Retain 104.6 in the calculation along with the original reading and instrument resolution; extra spreadsheet digits do not improve the measurement. Use a measurement boundary documented in the external static-pressure test record so converted values still refer to the same pair of taps.
Distinctions
- Pressure class
- Pressure class is a duct construction designation. It does not specify the pressure currently measured at a tap.
- Inches of mercury
- In. Hg uses a different reference fluid and conversion factor. It is not interchangeable with inches of water.
Frequently asked questions
Should I change every legacy in. wg label to Pa?
Change units only with the associated ranges, setpoints, alarm limits, trend metadata, and calculations. Relabeling a number without converting its scale creates an operating error.
Sources checked
Also defined as
- Datacenter: Inches of water column, the field unit for static pressure; 1 in. wg is about 249 Pa