CRAC

A CRAC, or computer room air conditioner, must be selected for the sensible cooling available from its refrigerant system at the specified air and heat-rejection conditions. Vertiv's DS105 example below delivers 98.2 kW net total but only 82.5 kW net sensible at the selected catalog point. Server heat uses the sensible portion. Carry the matched condenser, fan duty and return conditions into the schedule so a nominal model size does not stand in for usable capacity.

Computer room air conditioner, a direct-expansion unit with its own compressor and refrigerant circuit

Used across 2 Anvilfield field guides, most in Datacenter.
Updated

Net sensible kW is the useful IT cooling rating

Vertiv's Liebert DS System Design Catalog, revision 11 of February 2026, rates the 60 Hz DS105 downflow EC-fan model with two-step scroll cooling and an MCL110 condenser at 98.2 kW net total and 82.5 kW net sensible. Table 2.1 specifies 75 F dry-bulb and 61 F wet-bulb return air, 95 F outdoor ambient, 13,700 return ACFM and 0.2 in. wg external static pressure. The total includes moisture removal; the sensible portion handles temperature reduction.

Vertiv states that its DS net capacity data already account for fan-motor heat. Subtracting fan power again would reduce the available capacity twice. Carry the manufacturer's exact net/gross designation into the equipment schedule instead of relabeling every cooling number simply 'kW'.

AHRI's Datacom Cooling certification program identifies net sensible capacity and net sensible coefficient of performance, NSenCOP, as certified ratings. AHRI's standards page lists AHRI 1360-2022 in I-P units and AHRI 1361-2022 in SI units as the current editions on November 5, 2026. The DS table marks its 75 F row with a separate ASHRAE 127-2007 test-condition footnote; do not label that row an AHRI standard-rating point merely because the model also has AHRI-certified data.

Four units do not automatically provide N+1 capacity

Using the DS105 catalog point above, four operating units provide 330.0 kW sensible cooling. With one unavailable, the three survivors provide 247.5 kW. They fall 2.5 kW short of a 250 kW sensible load even though their combined net total rating is 294.6 kW. Counting total capacity would hide the deficit.

Repeat the survivor calculation with the selection row for the project's return condition. Record that duty in the cooling-system capacity schedule, then retain airflow and static pressure with the commissioning measurements so the capacity calculation and field record describe the same operating point.

Water connections do not always identify a CRAH

Vertiv's DS design catalog includes water-cooled and glycol-cooled refrigeration arrangements, as well as GLYCOOL equipment with separate economizer and DX coils. Trace what the water serves. Water rejecting condenser heat or feeding an economizer does not eliminate the unit's compressor-based cooling circuit.

AHRI 1360-2022's published scope covers complete computer and data-processing room air conditioners and excludes individual coils or condensing assemblies rated for separate use. Match the capacity statement to the assembled system and selected heat-rejection equipment.

Distinctions

Nominal model size
A model designation identifies an equipment size. Its capacity changes with the listed operating conditions, so the designation is not the accepted sensible cooling duty.
CRAH
A CRAH coil schedule needs entering and leaving chilled-water conditions. On a water-cooled CRAC, label the water schedule as condenser duty; otherwise an estimator can assign the wrong piping and control scope.

Frequently asked questions

Can I size a CRAC from total cooling capacity?

Match the server sensible load to net sensible capacity at the selected conditions. Include the separately calculated latent load when checking total capacity.

Does the CRAC rating include a separate condenser?

Read the matched-system selection and its stated outdoor condition. The complete performance record pairs the indoor unit with the selected heat-rejection equipment.