Tile open area
On a 24-inch-square airflow panel, 25% tile open area represents 144 square inches of openings. Air delivery needs a separate rating: Tate's December 2025 Perf1250 HPL sheet lists 480 CFM without a damper and 340 CFM with its slide damper fully open, both at 0.05 inch of water. Specify the panel model, finish, damper configuration and pressure-flow pair when ordering or balancing a replacement.
The fraction of a perforated tile that passes air; commonly 25 percent, up to 50 to 60 percent for grilles
Convert the percentage into square inches
Tate's Perf1250 HPL data sheet, dated December 17, 2025, identifies a 24-inch-square panel with 25% open area without a damper. Its face area is 24 × 24 = 576 square inches, so the nominal opening area is 144 square inches, or one square foot. The denominator is the entire panel face, including the solid portions.
A replacement purchase needs both the nominal opening area and a CFM rating at the available pressure. Use the airflow management guide to establish aisle demand, then select the exact panel configuration from its pressure-flow curve.
Compare identical open areas at the same pressure
Tate's ConCore 1250 HPL specification, revised February 2, 2026, lists 750 CFM for a powder-coated 25% open panel and 700 CFM for a laminated 25% open panel, both without dampers at 0.10 inch of water static pressure. The common percentage does not make their published performance equal.
The same Tate specification assigns its 32% open DirectPerf panel 1,285 CFM without a damper at 0.10 inch of water. Relative to the laminated 25% panel, the opening percentage increases by 28%, while published airflow increases by about 84%. The directional panel's geometry changes more than the hole-area total, so multiplying CFM by the ratio of open percentages does not reproduce its rating.
A fully open damper still restricts airflow
Tate's December 2025 Perf1250 HPL data sheet lists 480 CFM without a damper and 340 CFM with the slide damper fully open at 0.05 inch of water. Installing the open damper reduces the listed flow by 140 CFM, about 29%, even though the panel still carries the 25% description.
The same data sheet publishes the pressure-flow pairs below. At 0.10 inch of water, the closed slide damper still passes 60 CFM. Its closed position throttles airflow; it does not specify an air seal.
Tate's product page identifies top-access damper adjustment. Record the actual position with the panel model when comparing readings; a view of the perforated face alone will not reveal whether the underside has the configuration used by the selected curve.
| Pressure across panel, inches of water | No damper, CFM | Slide damper open, CFM | Slide damper closed, CFM |
|---|---|---|---|
| 0.05 | 480 | 340 | 40 |
| 0.10 | 700 | 490 | 60 |
Build a tile schedule from pressure-flow pairs
For four of those HPL panels at a measured 0.05 inch of water across each panel, the published undamped flow totals 4 × 480 = 1,920 CFM. With open slide dampers, the corresponding total is 4 × 340 = 1,360 CFM. That 560 CFM difference comes from the selected configuration, before allowing for unequal pressures across a real floor.
Give each scheduled tile a coordinate, product identifier, finish, damper condition, measured differential pressure and measured CFM. A replacement with the same nominal open area needs its own pressure-flow data. Reconcile the installed readings with the CRAC and CRAH airflow setup, particularly when tiles at different locations see different pressure.
Distinctions
- Face velocity and opening velocity
- For Tate's 24-inch-square Perf1250 HPL panel at 700 CFM without a damper and 0.10 inch of water, the average face velocity is 175 feet per minute: 700 CFM / 4 square feet. The 25% openings average 700 feet per minute: 700 CFM / 1 square foot. These are area averages; a single velocity reading at one hole does not establish total panel CFM.
Frequently asked questions
Does 25% open area mean the damper is 25% open?
No. The panel percentage describes its openings. Damper position describes an additional adjustable restriction beneath them. Specify both when ordering, balancing or replacing an airflow panel.