Wet-bulb temperature

Wet-bulb temperature is an evaporative-cooling measurement whose field value depends on instrument response and sampling. FHWA's sling-psychrometer method starts with 30 seconds of ventilation, then repeats 10-second spins until the wet thermometer reaches its minimum. Fieldpiece's JL3RH calculates wet-bulb electronically and specifies a typical 60-second humidity response. Keep the measured dry-bulb and wet-bulb pair, instrument method and pressure basis with the result so another technician can reproduce it.

The temperature air reaches when saturated by evaporation; the floor an evaporative cooler approaches but never beats

Used across 3 Anvilfield field guides, most in HVAC.
Updated

Read a sling psychrometer at its stable minimum

FHWA's coatings laboratory workbook starts its sling-psychrometer method with 30 seconds of ventilation, followed by additional 10-second spins and readings until the minimum wet-bulb temperature is obtained. It pairs the dry-bulb reading with the moment that minimum is recorded. An early reading taken while the wet bulb is still cooling is not the final air-state measurement.

The FHWA method uses distilled water and calls for a location shaded from direct heat and separated from machinery. Check the wet covering and thermometer fluid columns before taking the reading. These details extend the psychrometric chart guide: an accurately plotted point still represents the wrong state if the input came from an unsettled or contaminated instrument.

Electronic wet-bulb accuracy starts with the input sensors

Fieldpiece's JL3RH 2025 operator manual v25 specifies RH accuracy of ±2.5 percentage points from 10 to 90 percent RH at 23°C. That is a humidity-sensor specification, not a wet-bulb temperature accuracy of ±2.5°C. A computed temperature inherits errors from the measurements and calculation behind it.

The same Fieldpiece manual gives a typical humidity response time of 60 seconds for 90 percent of its total range. Moving a probe from a humid return to a drier supply and immediately saving the display captures part of the previous environment. Wait for the readings to settle at each location, or use separate probes that remain in their assigned air streams.

For this electronic probe, Fieldpiece instructs the user to remove the protective slip cover for measurement and avoid touching the sensor or cleaning it with detergents or solvents. The wet covering used on a mechanical psychrometer is not a maintenance instruction for an electronic humidity probe. Identify the instrument type before applying a familiar field habit.

Fieldpiece's JL3RH manual separately specifies temperature accuracy of ±1°F over 32°F to 113°F. Neither that dry-bulb specification nor the RH specification is a complete accuracy statement for the calculated wet-bulb result. Retain the two input specifications rather than relabeling either as wet-bulb accuracy.

Record the pressure used in a wet-bulb calculation

The National Weather Service's wet-bulb calculation reference takes air temperature, relative humidity and station pressure as inputs. FHWA's mechanical-psychrometer method likewise starts by obtaining the atmospheric pressure at the test location. A pressure basis belongs with the original temperature readings when they are converted into an air-state result.

Record whether the software uses entered pressure, an elevation setting or a fixed default. When two settled electronic instruments disagree, compare their pressure assumptions as well as their temperature and humidity inputs. The psychrometric chart reference covers plotting the resulting state; this instrument record preserves how that state was obtained.

Use wet-bulb depression as an arithmetic check

With dry-bulb at 75°F and wet-bulb at 62°F, wet-bulb depression is 13°F. If an unsettled wet-bulb reading is saved at 65°F instead, the recorded depression becomes 10°F, an error of 3°F before any chart lookup. The resulting humidity and equipment target will reflect the erroneous input.

Write down the two original temperatures, the sampling location and whether wet-bulb was measured or calculated. Keep the instrument's accuracy statement separate from the display resolution. A screen that resolves small increments does not establish equally small measurement error. Use the settled pair when interpreting evaporative cooling or humidity control.

Distinctions

Wet-bulb depression
Dry-bulb minus wet-bulb, expressed as a temperature interval. It is not the wet-bulb reading itself and cannot be entered in a chart field asking for wet-bulb temperature.
RH accuracy versus wet-bulb accuracy
The JL3RH's ±2.5 percentage-point RH specification applies to its humidity input at the stated conditions. It is not an uncertainty in degrees for the calculated wet-bulb temperature.

Frequently asked questions

Should I wet the tip of a digital psychrometer?

A digital humidity sensor does not become a sling psychrometer when wetted. Use its manufacturer's sensor-care method; the JL3RH instructions specify exposing the sensor for measurement and protecting it from contact and contamination.

Why do two wet-bulb meters disagree just after entering a duct?

They can have different starting temperatures, humidity exposure and response times. Place them in the same air stream and compare settled readings before treating the difference as a calibration offset.

Sources checked

Also defined as

  • The temperature read by a thermometer with a wetted wick, reflecting evaporative cooling and moisture together
  • The temperature read by a wetted, ventilated bulb; the gap below dry-bulb shows how dry the air is

Where this shows up

Next step: Follow HVAC controls bids

Back to the full field glossary