Field glossary · measurement
Grains per pound (gr/lb)
Grains per pound expresses the mass of water vapor carried by each pound of dry air. The dry-air denominator makes it useful for mixing-air and moisture-removal calculations: heating air changes relative humidity without changing grains per pound unless water enters or leaves. Write the unit as grains of water per pound of dry air when exchanging calculations with someone outside HVAC.
Absolute moisture: grains of water vapor per pound of dry air; the chart and load-calc unit
Convert grains to a usable moisture mass
Dividing the pound and grain mass factors in NIST SP 811 gives 7,000 grains per avoirdupois pound. Thus 70 gr/lb equals 0.010 lb/lb, or 10 g of water per kilogram of dry air. Preserve the dry-air basis through the calculation; substituting total moist-air mass introduces a different ratio.
ASHRAE's 2025 Fundamentals chapter on psychrometrics defines humidity ratio using water-vapor mass divided by dry-air mass. Absolute humidity expressed as mass per volume is a different property. Labeling both quantities simply 'absolute moisture' invites errors when air density changes.
Mix by dry-air mass, not by relative humidity
ASHRAE's 2025 psychrometrics chapter applies separate dry-air and water balances to adiabatic mixing. For two unsaturated streams that mix without condensation, the resulting humidity ratio is their dry-air-mass-weighted average. A mixture containing 20% of its dry-air mass at 100 gr/lb and 80% at 50 gr/lb therefore contains 60 gr/lb.
Do not average the two relative-humidity readings. Each RH value depends on its stream's temperature. Likewise, a volumetric outdoor-air fraction is not automatically the dry-air mass fraction when the two streams have appreciably different densities. Use the airflow and density basis supplied by the design calculation.
Turn a grain difference into condensate production
A dehumidifier handling 4,200 lb of dry air per hour and reducing moisture from 70 to 35 gr/lb removes 4,200 × 35 ÷ 7,000 = 21 lb of water per hour. That calculation isolates the water balance. It does not require treating a sensible temperature drop as evidence that moisture was removed.
On a cooling coil, compare the calculated water rate with collected condensate during stable operation, allowing for water retained in the pan and drain. Munters describes its desiccant rotor releasing captured moisture into a heated regeneration airstream instead. Use dry-air flow and inlet-to-outlet humidity ratios to check the process-air removal rate; condensate collection is not the matching verification method. The desiccant system guide identifies the process and regeneration paths.
Distinctions
- Dew point
- Dew point is a temperature associated with the vapor condition. Converting it to gr/lb also requires the applicable pressure.
- Relative humidity
- RH is a percentage of saturation at the measured temperature; gr/lb is a water-to-dry-air mass ratio.
Frequently asked questions
Does heating air lower its grains per pound?
No water is removed by sensible heating alone. RH falls as the air warms, while its humidity ratio stays unchanged unless condensation, evaporation, or another moisture-transfer process occurs.
Sources checked
Also defined as
- Absolute moisture per pound of dry air; 7000 grains equal one pound of water