ANVILFIELD Try FieldOS

Field glossary · measurement

Relative humidity (RH)

Relative humidity is 100 times the actual-to-saturation water-vapor pressure ratio at the measured temperature. Vaisala's example changes from 50% RH at 20 C to about 37% RH at 25 C with unchanged water-vapor pressure. Temperature agreement also controls measurement error: a probe that differs from 20 C air by 1 C introduces about 3 percentage points of error at 50% RH. Establish the probe's temperature before adjusting its humidity offset.

Air moisture in percent; lower RH raises resistance, so it is recorded with every reading

Used across 4 Anvilfield field guides, most in Datacenter.
Updated

A warmer probe can create a false humidity difference

Vaisala's humidity-instrument selection guidance reports that a 1 C difference between probe and air produces about 3 percentage points of RH error at 20 C and 50% RH. This is large enough to explain disagreement between a wall transmitter and a handheld carried in from another space.

Compare probes together in moving air after their temperatures stabilize. Keep hands, a warm instrument body and nearby cold surfaces from changing the sensing head's temperature. At 20 C and 100% RH, Vaisala gives roughly 6 percentage points of error for the same 1 C temperature mismatch. Near saturation, temperature agreement becomes more demanding.

Use temperature-specific humidity references

The National Bureau of Standards' evaluated humidity fixed-point data gives 32.78% RH over saturated magnesium chloride and 75.29% RH over saturated sodium chloride at 25 C. These are equilibrium reference values at that temperature, rather than rounded labels to apply at any room condition.

The readings below show a nearly constant positive offset across two reference points. Different errors at the low and high points would instead expose a span problem that a single-point check misses.

Record the reference temperature, assigned value and indicated value before adjustment. The fixed-point data's uncertainty belongs to the reference; the complete measurement also includes chamber stability and instrument effects. Keep that record with readings used for ESD floor testing.

Reference at 25 CNBS assigned RHProbe readingError, percentage points
Saturated magnesium chloride32.78%35.0%+2.22
Saturated sodium chloride75.29%77.5%+2.21

Separate a temperature change from actual drying

Vaisala calculates that air at 20 C and 50% RH falls to about 37% RH when warmed to 25 C with unchanged water-vapor pressure. That 13-point reduction does not represent water collected by a dehumidifier.

During structural drying, compare the temperature and dew point as well as RH when equipment settings change. In a data hall, use the same distinction to explain differences between cold-aisle and return-air instruments before changing the humidity-control sequence.

Distinctions

Percentage-point error
A reading of 53% RH against a 50% RH reference is 3 percentage points high. Relative to the reference reading, that is a 6% error; the two statements use different denominators.
Material moisture content
The roughly +2.2-point RH offset in the calibration example belongs to the air probe. It does not adjust the calibration of a material-moisture meter used on the same job.

Frequently asked questions

Does 100% RH mean the air contains only water?

No. It means the water-vapor partial pressure equals its saturation value at that temperature. Nitrogen, oxygen and other gases still make up the air mixture.

Should I correct two sensors until their RH numbers match?

Compare both instruments at the same 25 C reference and record each error against its assigned RH, such as 75.29% for saturated sodium chloride. Use those errors to judge calibration before changing the humidification controls.

Sources checked

Also defined as

  • HVAC: Water vapor present as a percentage of what the air could hold at its current temperature
  • Plumbing: Water vapor in the air as a percentage of what the air could hold at that temperature

Where this shows up

Next step: Browse humidity-control bids

Back to the full field glossary