Class 1 to 4
Under AlorAir's published water-loss guidance, Class 1 means wet porous surfaces occupy less than about 5% of the enclosure's combined floor, wall and ceiling area; Class 2 spans about 5% to 40%, and Class 3 exceeds about 40%. Class 4 has no percentage cutoff: substantial absorption into slow-drying materials triggers that assessment even with a small footprint. A whole wet floor can therefore fall in Class 2, while a small concrete patch can need Class 4 drying.
The amount of water and evaporation load: 1 the least, 4 deeply bound moisture in hardwood, plaster, or concrete
Calculate wet area against all six room surfaces
A rectangular room's combined surface area is 2LW + 2H(L + W), where L and W are its length and width and H is its height. Include the dry surfaces in this denominator. The numerator is the affected porous surface area identified by the moisture inspection. Dividing wet floor area by total floor area answers a different question.
A 24 by 16 ft room with a 9 ft ceiling has 384 sq ft of floor, 384 sq ft of ceiling and 720 sq ft of walls: 1,488 sq ft altogether. Wet carpet across the whole floor plus 160 sq ft of wet wallboard totals 544 sq ft. The affected proportion is 544 / 1,488 x 100 = 36.6%. Although the entire floor is wet, this falls in the Class 2 surface-area band when slow-drying materials have absorbed little water.
Where the 5% and 40% boundaries apply
AlorAir describes Class 1 as wet porous materials affecting less than about 5% of the combined floor, wall and ceiling surface area. AlorAir's Class 2 band covers approximately 5% to 40% of the combined floor, wall and ceiling surface area. AlorAir places Class 3 above approximately 40%, provided substantial absorption into slow-drying materials does not call for Class 4.
These are approximate classification boundaries. Record the measured dimensions beside the class so another restorer can reproduce the calculation. In the room above, 5% is 74.4 sq ft and 40% is 595.2 sq ft. Finding another 100 sq ft of wet ceiling raises the total to 644 sq ft, or 43.3%, changing the surface-area classification to Class 3.
Why a small wet footprint can still be Class 4
AlorAir's Class 4 criterion depends on absorption into resistant materials, rather than a larger wet-area percentage. A 40 sq ft concrete landing in the 1,488 sq ft enclosure occupies only 2.7% of the combined surfaces. If the inspection establishes substantial absorption into that concrete, the low percentage does not justify calling it Class 1. The evidence needed is the material condition at depth, not a larger area on the sketch.
Keep separate lines for surface area and assembly condition on the worksheet supporting the structural drying guide. For the landing, record the concrete reading locations, measurement method and comparison location alongside its 40 sq ft footprint. Retain the original worksheet when removal exposes additional wet surfaces, then date the revised calculation so the change in class can be reconstructed.
Distinctions
- Water category
- An estimate marked only Class 3 still leaves the water-category finding unanswered. AlorAir treats these as separate classifications. Keep the contamination observations in the category field and the measured surface areas in the class field; one number cannot fill both entries.
Frequently asked questions
Is the class based on the gallons extracted?
The surface-area calculation uses the wet porous materials remaining in the drying space. Extracted gallons belong in the extraction record. Two rooms with the same extracted volume can leave different exposed wet areas and different absorption into retained assemblies.
Which S500 edition should the class record identify?
Use ANSI/IICRC S500-2021, fifth edition, as the published edition at this November 5, 2026 review; IICRC reports that its revision committee is working on a successor. A revision project is not a replacement edition. Record the edition used with the class worksheet so a later reviewer can identify the classification basis.
Sources checked
Also defined as
- Drying difficulty by how much is wet, from least (1) to specialty bound-water materials (4)