ANVILFIELD Try FieldOS

Field glossary · property

Vapor pressure

Water's saturation vapor pressure is about 2.34 kPa at 20°C using the National Weather Service equation. Actual vapor pressure in air equals the saturation value times relative humidity, so 30°C air at 60 percent RH reaches about 2.55 kPa and can condense on that cooler wet surface. Pump calculations use the liquid's saturation value on an absolute-pressure basis; an RH percentage or a psig reading cannot substitute for it.

The push that moves water vapor from wet materials toward drier air; drying follows the gradient

Used across 2 Anvilfield field guides, most in Plumbing.
Updated

Two rooms at the same humidity can contain different vapor pressures

The National Weather Service's vapor-pressure equation gives saturation pressure of about 2.34 kPa at 20°C and 4.24 kPa at 30°C. At 50 percent relative humidity, the corresponding actual vapor pressures are about 1.17 and 2.12 kPa. Equal relative humidity therefore does not mean equal water-vapor pressure.

Pacific Northwest National Laboratory defines relative humidity as actual vapor pressure divided by saturation vapor pressure at the air temperature, expressed as a percentage. Temperature belongs with every RH reading used to judge a drying condition.

Record dry-bulb temperature and RH together, or use dew point to determine actual vapor pressure. Use the structural-drying log to track calculated vapor pressure alongside material moisture readings; falling RH alone does not establish a stronger drying gradient.

Compare the air with the wet surface temperature

Using the National Weather Service equation, air at 30°C and 60 percent RH has an actual vapor pressure of about 2.55 kPa. A fully wet surface at 20°C has a saturation pressure near 2.34 kPa. That air does not provide an outward vapor-pressure gradient from the cooler wet surface even though its RH is only 60 percent.

Cooling the surface below the air's dew point allows condensation. Warming the air alone lowers its RH without necessarily reducing its actual vapor pressure; removing moisture changes the vapor pressure directly. Heat reaching the material also changes the surface condition, so measure the material temperature rather than substituting the room thermostat reading.

Porous materials add moisture binding and transport resistance. A wet surface is a useful boundary case, but moisture readings within the material still determine whether the assembly is drying through its thickness. A room-air calculation does not establish a concealed layer's moisture content.

At a pump, use saturation pressure and an absolute reference

The Hydraulic Institute defines NPSH available using suction total head above the liquid's vapor-pressure head at operating temperature. A rise in liquid temperature raises its vapor pressure and reduces that available margin when the other conditions remain fixed.

Water's 2.34 kPa saturation pressure at 20°C is about 0.34 psia. With atmospheric pressure measured at 14.7 psia, a -5 psig suction reading converts to 9.7 psia. Subtracting vapor pressure leaves 9.36 psi, about 21.6 ft of water pressure head, before velocity and gauge-to-pump-datum corrections. This calculation uses two absolute pressures rather than subtracting an absolute property from a gauge reading.

When calculating from the supply vessel, include suction-pipe losses to the pump datum. When calculating from a pump-inlet gauge, those upstream losses are already reflected in its reading; include only the remaining tap-to-datum terms. Plot that available head beside the required margin in the cavitation diagnosis record, using the actual liquid temperature.

Distinctions

Relative humidity
A temperature-dependent ratio, not the vapor pressure itself.
Dew point
At unchanged moisture content, cooling below dew point begins condensation even though the starting room-air RH was below 100 percent.

Frequently asked questions

Does lower RH always mean drier air for a cold wet wall?

No. Compare actual vapor pressures and the wall temperature. Warm air at lower RH can have more water-vapor pressure than cooler air at higher RH.

Sources checked

Also defined as

  • HVAC: The pressure at which water flashes to vapor at a given temperature; it rises sharply with temperature and is subtracted from NPSHa

Where this shows up

Next step: Find structural drying bids

Back to the full field glossary