Field glossary · measurement
Total dynamic head (TDH)
TDH is the pump's required head coordinate at a specified flow, with source and destination conditions defined. Using the Hydraulic Institute's head balance, an atmospheric water source feeding a point 20 ft higher at 40 psig, with 18 ft of pipe loss, needs about 130.4 ft before any additional velocity term. Change the flow or boundary pressures and that head changes; the complete pump duty includes both gpm and feet.
The total head a pump must overcome, in feet: the static lift plus the friction head through the force main and fittings at the design flow
Build the system curve from more than one duty point
Taco's hydronic application guidance describes pipe-system friction head as varying roughly with the square of flow. If a fixed path loses 12 ft at 100 gpm, that approximation predicts 27 ft at 150 gpm: 12 × (150/100)². The approximation assumes the same piping and valve positions over the flow range.
Add a 25 ft static requirement and the two duty points become 100 gpm at 37 ft and 150 gpm at 52 ft. Raising the flow by 50 percent has not raised the static term; it has raised the friction term by 125 percent. A control valve moving between those conditions would produce a different curve.
A pump offered for 150 gpm at 45 ft misses the 150 gpm, 52 ft requirement in this calculation even though 45 ft exceeds the separate 100 gpm requirement. Compare offered and required head at matching flows on the lift-station selection sheet, using the stated wet-well levels and force-main arrangement.
Keep a required outlet pressure in the budget
The Hydraulic Institute's system-head equation includes pressure head at the destination as well as elevation and losses. An open discharge has atmospheric boundary pressure; an irrigation nozzle or pressurized receiving vessel does not.
For water, a required 40 psig at the delivery point contributes about 92.4 ft of pressure head. With 20 ft of elevation rise and 18 ft of piping loss at the selected flow, an atmospheric-source system needs about 130.4 ft before any additional velocity term. Omitting the delivery-pressure requirement would select a radically different duty.
Define whether the terminal component's required pressure already includes its operating loss. Adding the same nozzle or equipment requirement once as terminal pressure and again as a component loss double-counts it. Keep the boundary immediately upstream or downstream of that component explicit.
Check the zero-flow intercept and the full operating range
For open systems with static head, Taco recommends pump shutoff head 5 to 10 percent above static head to preserve the ability to establish flow. This is a starting margin against the zero-flow requirement, not a substitute for meeting the required TDH at design flow.
A system with 60 ft of static head would have a 63 to 66 ft shutoff target under that recommendation. A pump that clears 66 ft at shutoff can still be too small once its curve falls and the system's friction rises at the required flow.
Review low and high source levels, parallel-pump operation and each operating valve arrangement. At every duty point, assess suction conditions separately; sufficient discharge head does not establish adequate net positive suction head.
Distinctions
- Static head
- The boundary requirement that remains as flow-dependent friction approaches zero.
- NPSH available
- The suction-side head above the liquid’s vapor-pressure head; it addresses vapor formation rather than the delivery duty.
Frequently asked questions
Can I read TDH directly from the discharge gauge?
Only with the rest of the head balance established. Suction pressure, tap elevations and velocity differences affect pump differential head; a discharge reading alone includes pressure the source may already provide.