Field glossary · process
Cavitation
A pump with positive suction gauge pressure can still cavitate because liquid pressure falls further as it enters the impeller. The useful comparison is absolute suction head above vapor pressure against the pump's requirement at actual flow. Hydraulic Institute's NPSH3 identifies a 3% head reduction during testing, so merely matching that value already accepts a measurable loss of performance. The specified margin belongs above the identified requirement.
Vapor bubbles forming and collapsing at the impeller when suction pressure falls below the water's vapor pressure, eroding the metal
Read NPSH3 as a performance test point
The Hydraulic Institute defines NPSH3 as the available suction head at which cavitation reduces pump total head, or first-stage head, by 3% during the test. That number describes an established performance reduction. It is not the pressure at which the first vapor cavity appears and is not a guarantee of operation without cavitation damage.
Hydraulic Institute's reliability guidance distinguishes NPSH3 from the additional NPSH margin needed for reliable service. A curve labeled NPSHR also needs its manufacturer's definition: some published requirements already incorporate margin. Keep the curve, speed, impeller and flow together before subtracting its value from calculated NPSHA. Otherwise the apparent margin can compare two different rating bases.
Quantify what hotter water changes
Emerson's Control Valve Handbook water-property table gives vapor pressures of 0.9492 psia at 100°F and 7.510 psia at 180°F. Rounded for a field calculation, heating between those temperatures consumes another 6.56 psi of the suction pressure allowance. Record temperature changes even when the suction gauge appears steady.
A suction reading recorded only as 5 psi cannot support the vapor-pressure comparison: retain whether it is gauge or absolute. Put local barometric pressure, liquid temperature and gauge elevation on the cavitation diagnostic sheet beside the running pressure so another technician can reconstruct the same suction-head basis.
Distinguish vapor collapse from a source of entrained air
A leaking suction joint, vortex at an intake or incompletely vented casing introduces gas without requiring the liquid to vaporize. Both conditions disturb pump performance, and both can be present together. Record whether bubbles enter from the source, whether the noise changes with temperature and flow, and whether the measured suction losses match the installed piping. Replacing an impeller without resolving those observations leaves the cause in place.
Distinctions
- NPSH margin
- The margin is the allowance above the identified pump requirement. A positive arithmetic difference alone does not establish the margin specified for the service.
Field example
At 5 psig suction and 14.7 psia local atmospheric pressure, inlet absolute pressure is 19.7 psia. Subtracting Emerson's vapor pressures leaves about 18.75 psi at 100°F and 12.19 psi at 180°F. These pressure differences isolate the temperature effect; calculating NPSHA in feet also requires liquid density, inlet velocity head and the gauge elevation relative to the pump datum.
Frequently asked questions
Can a pump cavitate while the suction gauge reads above zero?
Yes. Gauge pressure excludes atmospheric pressure, and the impeller eye operates below the pressure at the upstream gauge location. Use absolute pressure and the pump requirement at actual flow.
Sources checked
Also defined as
- Datacenter: Vapor bubbles forming and collapsing at the impeller when suction pressure falls too low, damaging the pump and crashing the discharge
- Landscaping: Vapor bubbles forming and collapsing at the impeller when suction pressure drops too low, which damages the pump