BEP means BIM execution plan on an information-delivery submission, but best efficiency point on a pump selection. A tender BEP proposes how the team will deliver information; the appointed team's version confirms the agreed approach. A pump BEP must identify the curve's speed and impeller diameter as well as the flow and head. Expand the abbreviation on the transmittal or selection sheet before comparing two submissions.

BIM execution plan: the agreement on who models what, to what LOD, on what schedule, and to what standards

Used across 2 Anvilfield field guides, most in Datacenter.
Updated

BIM execution plans change between tender and appointment

The UK BIM Framework's Guidance Part E, edition 2, distinguishes a pre-appointment BEP submitted with the tender response from the delivery team's BEP confirmed during appointment. ISO 19650-2:2018 provides the delivery-phase information-management framework. The proposal describes the team's approach; confirmation makes that approach specific to the appointed team and its agreed information requirements.

Guidance Part E separates the BEP from supporting resources such as the detailed responsibility matrix and master information delivery plan. A coordination document that names a model author but never establishes when an information exchange is accepted leaves a practical gap. Keep the agreed approach linked to the actual deliverables, acceptance requirements and responsible parties instead of expanding the BEP into an uncontrolled copy of every project schedule.

Write out BIM execution plan in a coordination transmittal, carrying the revision and the appointment it governs. The BIM coordination guide applies this meaning.

Best efficiency point belongs to one pump curve

The Hydraulic Institute locates pump BEP using the highest efficiency on the curve for the selected speed and impeller diameter. Record all three identifiers with the BEP flow: curve revision, speed and diameter. A percentage such as 82% describes efficiency; a percentage of BEP flow describes how far the operating flow sits from that curve's reference point.

The Hydraulic Institute describes preferred operating regions ranging from 90% to 110% of BEP flow to 70% to 120%, depending on pump specific speed. Applying the wider band to every pump therefore misreads the guidance. A curve with BEP at 500 gpm has a 450 to 550 gpm band at 90% to 110%; a 350 to 600 gpm band belongs only to a pump for which the wider region applies.

Identify best efficiency point in a selection record with the curve revision, impeller diameter, speed and duty flow and head. The hydronic pump guide and irrigation selection guide apply this meaning.

Distinctions

Duty point
The flow and head required by the system. It can lie near or away from the pump BEP.
Allowable operating region
The Hydraulic Institute's AOR covers operation limited by factors including cavitation, vibration and shaft loading. Its POR identifies the narrower region for efficiency and reliability; an AOR boundary is not a preferred duty point.

Frequently asked questions

Does BEP mean the middle of the pump curve?

Locate the peak of the efficiency curve at the specified speed and impeller. The visual midpoint of a plotted chart is not the definition.

Is the tender BEP the final delivery document?

UK BIM Framework guidance calls for revisiting and confirming it during appointment, with updates reflecting the appointed team and agreed approach.

Sources checked

Also defined as

  • HVAC: Best efficiency point, the flow where the pump runs most efficiently and with the least wear

Where this shows up