Field glossary · measurement
Operating point
A measured pump operating point pairs simultaneous flow with the head added between suction and discharge. At equal-elevation, equal-diameter taps, 9 psig discharge and minus 2 psig suction give about 25.4 ft for water at specific gravity 1.00 using Xylem's conversion. Measuring 190 gpm at that condition establishes 190 gpm at 25.4 ft. Save speed and impeller diameter with the point before comparing it with design duty or the manufacturer's preferred region.
Where the pump curve crosses the system curve; the flow and head the pump actually delivers in that loop
Build a measured pump point from both gauges
A discharge gauge alone does not measure the head added by a pump. Use the difference between discharge and suction pressures, then account for the tap elevations and velocity-head difference. Xylem's pump-fundamentals manual converts pressure in psi to feet of liquid by multiplying by 2.31 and dividing by specific gravity.
For water at specific gravity 1.00, discharge pressure of 9 psig and suction pressure of minus 2 psig give an 11 psi increase, equivalent to about 25.4 ft of head. With pressure taps at equal elevation in equal-diameter pipe sections, the elevation and velocity corrections cancel. A simultaneous flow reading of 190 gpm establishes the measured point as 190 gpm at 25.4 ft.
Save the pump speed and impeller diameter with that pair before overlaying it on a manufacturer's curve. Compare the fluid condition as well. The hydronic pump installation guide establishes the installation checks; this measurement identifies the duty that the assembled system actually produced.
Compare the duty with the preferred region
Wilo's pump-selection training gives a typical preferred operating region of 70% to 120% of best-efficiency-point flow, including an example with 290 gpm BEP and a 203 to 348 gpm preferred range. Those numbers describe that stated range, not every pump's permissible operating envelope.
If the measured 190 gpm point belongs to that selection, it is about 65.5% of BEP flow and below the 203 gpm preferred boundary. The useful follow-up is the selected pump's operating-region data and the cause of the low flow. A point being below the preferred region does not by itself prove it is outside the allowable region.
Wilo identifies the allowable operating region as a wider, manufacturer-established range based on testing. Hydraulic Institute's current ANSI/HI 9.6.3-2024 guideline addresses both regions and the effects of rotational speed, power limits, vibration, and NPSH margin on operating limits. Preserve the manufacturer's boundaries with the curve rather than replacing them with a generic percentage.
Record the operating range, not one convenient reading
Build an operating-range record with a row for each intended combination of tank level, active branches, valve position, and speed command. Pair the measured flow and head with its matching speed curve and manufacturer limits. A point recorded at a full source tank cannot establish the suction margin or transfer duty at minimum tank level.
The selected point also locates power demand and required suction head on the associated curves. Wilo's guidance identifies increasing NPSH requirement near runout as a potential cavitation problem. A satisfactory flow/head match therefore still needs the suction margin and motor load associated with that same condition.
For a fan, use the same simultaneous-duty discipline but retain air density and the curve's pressure definition. The fan laws guide explains how speed changes the family of curves; changing speed moves the selection basis as well as the observed flow.
Distinctions
- Best-efficiency point
- Wilo's 290 gpm BEP remains the efficiency reference when measurements locate a 190 gpm duty. That measured point is 65.5% of BEP flow; the percentage is a comparison with the reference, not a new BEP.
- Design duty
- Retain the scheduled duty separately from the measured 190 gpm at 25.4 ft. Put the test system state beside the measured pair so the acceptance comparison has both a specified target and reproducible operating evidence.
Frequently asked questions
Can two pressure gauges locate the operating point?
The example's 9 psig and minus 2 psig readings establish 25.4 ft of added head under the stated tap conditions. The simultaneous 190 gpm measurement supplies the other coordinate; speed and impeller diameter identify the curve used for comparison.
Sources checked
Also defined as
- Where the fan curve and the system curve cross, the airflow and pressure the fan actually delivers