Fan curve

Read a fan curve with its pressure definition, rotational speed, air density, and power boundary attached. Under ANSI/AMCA 210-25, a 2.2-inch-water-gauge total-pressure rise with 0.4 inch outlet velocity pressure represents 1.8 inches of fan static pressure. Those are different pressure-axis values for the same measured duty. Apply the density correction before comparing catalog shaft horsepower with a field reading, and distinguish shaft demand from electrical input.

The manufacturer plot of airflow against static at a given speed, used to confirm the fan is at its design point

Used across 2 Anvilfield field guides, most in HVAC.
Updated

Identify static pressure before plotting the reading

ANSI/AMCA 210-25 and ANSI/ASHRAE 51-25 define fan static pressure as fan total pressure minus the velocity pressure at the fan outlet. It is therefore not simply the outlet static reading minus the inlet static reading. The inlet's velocity component affects that comparison.

For a fan developing 2.2 inches water gauge of total pressure with 0.4 inch of outlet velocity pressure, the corresponding fan static pressure is 1.8 inches water gauge. Plotting 2.2 on a static-pressure curve would place the measured condition at the wrong pressure, even when the airflow measurement is sound.

ANSI/AMCA 210-25 defines fan airflow on the density corresponding to inlet total pressure and inlet stagnation temperature. Record the inlet conditions, pressure-tap locations, and the selected curve's pressure basis on the air-balancing report. A duct traverse volume and a catalog volume need the same density basis for a direct comparison.

Correct pressure and horsepower for air density

Greenheck's industrial-process fan catalog bases its standard-air performance on a density of 0.075 pound per cubic foot, corresponding to dry air at 70°F and sea level. Greenheck applies density corrections to static pressure and brake horsepower while keeping volumetric airflow unchanged at the corresponding fan speed and curve point.

Apply Greenheck's density relationships to a 6,000 cfm point at fixed speed. Reducing density from 0.075 to 0.060 pound per cubic foot gives a multiplier of 0.8 for pressure and shaft horsepower. The following calculated points translate the curve; the connected system still determines the operating duty.

When selecting from the standard-density curve, reverse that calculation: divide the required actual-density pressure by the density ratio. Keep the airflow requirement on its stated actual-volume basis. Mixing an actual cfm requirement with a standard-volume conversion changes the selection twice.

Air density, lb/ft³Airflow, cfmFan static pressure, inches wgShaft power, bhp
0.0756,0002.05.0
0.0606,0001.64.0

Keep the power boundary attached to the curve

ANSI/AMCA 210-25 distinguishes mechanical input at the fan shaft from electrical input measured across different motor, drive, and controller boundaries. A brake-horsepower curve describes shaft demand. A meter at the electrical supply also sees losses in the included electrical and drive equipment.

Retain the exact wheel size, rotational speed, inlet and outlet accessories, air density, and power basis with a saved selection. A graph detached from those details cannot resolve a disagreement between field watts and catalog horsepower. If operating speed changes, select the matching curve or apply the relationships described in the fan laws guide.

Distinctions

System curve
Match its pressure basis and airflow reference to the fan curve before finding an intersection. A total-pressure system demand and a static-pressure fan rating need the outlet-velocity adjustment before they can represent the same duty.
Motor nameplate horsepower
The table's 5.0 bhp is a shaft demand at one curve point. Compare it with available motor output on the nameplate; a supply-side wattmeter includes motor and any included drive losses as well.

Frequently asked questions

Why can a hot-air fan overload during a cold start?

At corresponding points in the table, increasing density from 0.060 to 0.075 lb/ft³ raises shaft demand from 4.0 to 5.0 bhp, a 25% increase. Greenheck's guidance calls for motor selection to account for the denser startup condition as well as normal hot operation.

Which fan test standard is current?

The current joint laboratory rating standard is ANSI/AMCA 210-25 and ANSI/ASHRAE 51-25. Preserve the edition stated on a particular manufacturer's rating when comparing older equipment.

Sources checked

Also defined as

  • The manufacturer's plot of pressure against airflow for a fan at a given speed