ANVILFIELD Try FieldOS

Field glossary · measurement

System curve

Each point on a system curve pairs a requested flow with the pressure or liquid head needed to produce it. A transfer system needing 20 ft of static lift plus 40 ft of friction head at 200 gpm still needs 30 ft at 100 gpm under a square-law friction model. That static contribution distinguishes transfer pumping from closed-loop circulation. Fan curves use airflow and pressure loss; the same choice of measurement boundary matters.

The plot of head the piping demands against flow; it climbs with the square of velocity because friction rises with velocity

Used across 3 Anvilfield field guides, most in HVAC.
Updated

Find the static-head intercept before fitting a curve

The Hydraulic Institute defines static head from the elevation and pressure differences between a system's supply and destination. Two open tanks at equal surface pressure contribute their liquid-level difference. A pressurized destination adds a pressure-head requirement even when both tanks are at the same elevation.

Wilo's system-curve guidance places the curve for a filled, closed circulation system at zero head when flow is zero because there is no net static lift around the loop. The building's fill pressure remains necessary for the water system, but it is not an extra lift to add on every circuit around the piping. This distinction matters when applying the hydronic pump selection guide.

Calculate a transfer curve from one established duty point

For a fixed piping and valve arrangement operating with approximately constant turbulent-flow resistance, write H = Hstatic + KQ². This is a reduced form of the Hydraulic Institute's static-plus-friction head relationship. Keep the flow units attached to K; changing from gpm to another unit changes its numerical value.

Take a transfer duty of 200 gpm at 60 ft total head, including 20 ft of static head. The friction contribution is 40 ft, so K = 40 / 200² = 0.001 ft/(gpm)². Halving flow to 100 gpm reduces friction to 10 ft and total required head to 30 ft. Squaring the flow ratio against the entire 60 ft would incorrectly predict 15 ft, less than the static lift itself.

The 200 gpm duty is attainable only if the selected pump can supply 60 ft at that flow and operating speed. Wilo's pump-selection guidance uses the meeting of supply and demand curves to establish the delivered duty. A measured 150 gpm operating point therefore calls for a curve comparison, even if the motor has the specified horsepower.

FlowCalculated friction headStatic plus friction
100 gpm10 ft30 ft
150 gpm22.5 ft42.5 ft
200 gpm40 ft60 ft
250 gpm62.5 ft82.5 ft

Turn pressure readings into comparable head readings

The Hydraulic Institute converts pressure to feet of liquid with H = 2.31 × pressure in psi / specific gravity. For water taken at specific gravity 1.00, a 10 psi pressure difference represents 23.1 ft of head. Pressure taps at different elevations or pipe diameters also need elevation and velocity-head corrections; subtraction of gauge numbers alone does not capture those differences.

Record liquid levels, valve positions and the active branches with each measured flow-head point. A change in these conditions creates a different curve. Retain separate curves for the low and high tank levels or the operating valve arrangements, rather than forcing unlike readings into one fit. The balancing guide covers setting individual circuits once the operating arrangement is established.

Match static or total pressure on a fan plot

AMCA's 2020 article Straightening Out Fan Curves treats duct resistance as approximately proportional to airflow squared. For an unchanged duct arrangement and air density, a measured 2,000 cfm at 0.80 in. w.g. becomes a calculated requirement of 1.25 in. w.g. at 2,500 cfm: 0.80 × (2,500/2,000)². That is a required pressure at the higher flow, not a promise that the existing fan will deliver it.

AMCA's published fan example has 5.0 in. w.g. static pressure and 0.35 in. w.g. outlet velocity pressure at 12,000 cfm, giving 5.35 in. w.g. total pressure. Compare a system requirement with the matching static- or total-pressure curve. The 0.35 in. w.g. difference is a pressure-basis difference, separate from the static lift in the transfer-pump calculation. Use the fan-law guide for speed changes after identifying that basis.

Distinctions

Pump shutoff head
The pump's head at zero flow belongs to its performance curve. The system's zero-flow intercept is its static requirement. These are independent quantities.
Fan static pressure
An air-side pressure quantity used with the fan's static-pressure curve. The word static here does not identify a liquid system's elevation-and-endpoint-pressure requirement at zero flow.

Frequently asked questions

Can I build a system curve from pump horsepower?

Horsepower does not establish the elevation, endpoint pressures or piping resistance. Establish the system boundary and head-loss data, then compare the resulting demand with the selected pump's performance.

Does the square-law fit apply all the way down to zero flow?

The Hydraulic Institute notes that friction factor changes with flow and that low velocities can become laminar. Use the appropriate loss model through that region; the static intercept remains a separate calculation.

Sources checked

Also defined as

  • The plot of head the piping demands against flow; balancing reshapes it, and the pump runs where its curve crosses it
  • The duct's square-law plot of pressure required against airflow through that arrangement

Where this shows up

Next step: Find hydronic pump bids

Back to the full field glossary